桥梁技术(Bridge technology).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
桥梁技术(Bridge technology) [hide = 100] bridge construction technical scheme One, bored pile 1. Preparation A site preparation This project mainly is the land pile, when the construction, first clears the debris of the ground, the whole flatness compacted, set up the protection tube after the sample. B mounting sleeve 1) the inner diameter of the protector is 200 ~ 400mm larger than the pile diameter. 2) the center line of the protective cylinder shall overlap with the center line of the pile, except for the design, the plane allowed the error to be 50mm and the vertical line should be less than 1%. 3) the retaining tube of the dry land and the construction of the island can be used to bury the hole, and the soil in the bottom and the surrounding areas must be layered and compacted. 4) height of protecting cylinder is 0.3 m above ground level. When there is pressure water in the borehole, it should be above the stable pressure level of 2.0 m. If the pressure level is not stable or stable, the water level above the ground level is higher than that of the underground water level, and the test pile should be done first to identify the feasibility of using the hole filling pile foundation in such areas. 5) the depth of buried depth should be determined according to the design requirements or the hydrogeological conditions of the pile position, and the depth of land is not less than 1.0 ~ 1.5m. 7) no protrusion in the cylinder is required. It should be pulled, pressed and not leaking. C mud modulation and use of technical requirements Drilling mud is generally made of water, clay (or bentonite) and additives according to the appropriate mix ratio, and its performance indicators can be selected as follows. Mud performance index selection drilling Methods the formation Mud performance indicator Relative density viscosity (Pa) ° s sand ratio (%) colloid rate (%) water loss rate (30 ml/min) mud skin thickness (mm / 30 min) static shear force (Pa) pH value (pH) It is circulating

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档