隧道仰拱施工作业指导书(Operation guide book of tunnel invert construction).docVIP

隧道仰拱施工作业指导书(Operation guide book of tunnel invert construction).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
隧道仰拱施工作业指导书(Operation guide book of tunnel invert construction) Operation guide book of tunnel invert construction Inverted arch is one of the main parts of tunnel structure, and it is the foundation of tunnel structure. On the one hand, the formation pressure on the upper part of the tunnel passes through the side wall structure of the tunnel, or the load on the road is effectively transmitted to the ground, and it also resists the counterforce from the lower stratum of the tunnel effectively. In fact, it is a foundation beam (plate) that can endure the permanent load of the formation and the load (dynamic load) when the road is facing. Therefore, the stress state of the inverted arch is complex. From the case of traffic tunnel disease at home and abroad to see, because the structure of the design and construction of tunnel invert, and tunnel structure instability, pavement settlement and cracking, examples of mud disease of a few. Therefore, the structure of the invert structure must be fine, and the structure must comply with the specifications and design requirements. First, inverted arch excavation: 1. The size of the foundation pit to be inverted shall comply with the requirements of the design documents. 2, according to the different types of surrounding rock, the tunnel with the upper and lower steps shall be used to control the length of the excavation during the excavation of the earth. General: Class III and the rock section, excavation length should be less than 5.0M. In particular, a steel support area should be short of digging out, IV and above the rock section length should be less than 10M. When the surrounding rock condition is better, the maximum should not exceed 15M. 3, in order to avoid excavation and vibration of the formation of the initial lining structure have adverse effects and try to control over excavation, inverted arch excavation is strictly prohibited to enlarge the gun, control the charge. 4, as far as possible the use of light blas

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档