西南交《建筑施工技术C》在线作业一(Southwest to pay construction technology C online homework one).doc

西南交《建筑施工技术C》在线作业一(Southwest to pay construction technology C online homework one).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
西南交《建筑施工技术C》在线作业一(Southwest to pay construction technology C online homework one) Southwest to pay construction technology C online homework one Total score: 100 test time: - Radio examination A multiple-choice question Radio examination questions (20 questions, 80 points) 1. concrete 3 specimens each, its test result is 20, 25, 27 (unit N/mm2), this groups representative value is () A. 20 B. 24 C. 25 D. 27 Full marks: 4 2. concrete that reaches the final setting after mixing is the correct method of disposal A. water and then continue to use B. after mixing with water and cement, continue to use C. after mixing again, continue to use D. shall not be used again Full marks: 4 3. when the revolving method is used for hoisting the column of the workshop, the layout shall be satisfied The A. lashing point and the base cup center are on the arc of the work radius of the crane The B. column center and colligation point on the arc radius of crane The C. column center, colligation point and foundation cup in the center on the arc radius of crane The D. column center, colligation point and a foundation cup rim center and the center of gravity in the arc column radius on the crane Full marks: 4 4. in the sand containing saturated water, when the pile is sunk, what is the best equipment for piling? () A. drop hammer B. steam hammer C. diesel hammer D. vibratory hammer Full marks: 4 5., according to the degree of difficulty of construction excavation, soil types are divided into () A. six categories B. eight categories C. ten categories D. twelve categories Full marks: 4 6. in the winter construction method of concrete, the cost is lower and the effect is better A. electric heating method B. steam heating method C. regenerative process D. additive method Full marks: 4 7. after mixing, the concrete which reaches the initial setting state but does not reach the final setting state, is the correct disposal method A. water and then continue to use B. after mixing with water and cem

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档