- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
瓦良格的前世今生(The former life of varyag)
The former life of varyag
The varyag has attracted a lot of attention from the Chinese, a concern that has gathered hundreds of millions of Chinese eager to see the countrys first aircraft carrier. Since it was launched in 1988, the varyag has experienced 22 years of wind and rain, and its tortuous experience has been a true reflection of Chinas decades-long search for aircraft carriers.
The age of empire - varyags collapse from start to death
Two heavy-lift cruisers of the navys kuznetsov aircraft carrier
On May 7, 1982, after repeated brewing and discussion, the central committee of the communist party of the Soviet union and the council of ministers made in accordance with the design of 1143.5 to build the third generation of the carriers decision, in fact the Soviet union was also defines a carrier as heavy vehicle cruiser. Order after the first 105 (1143.5 design factory number. order 105 has been named tbilisi, is now admiral kuznetsov) in the year starts in September, after the Soviet union in 1983 the army decided to build a second order 106 (1143.6), and also by the federation, the republic of Ukraine Nicholass black sea shipyard construction. There are nearly five thousand Soviet enterprises, scientific research institutes and design bureaus involved in the construction of the aircraft carrier.
To build the aircraft carrier, the Soviet government funding on the black sea shipyard second large-scale technical transformation, including the completed assembly and welding workshop, allows for the hull weight increase to 200 tons; Equipped with two self-flatbed vehicles with a load of 350 tons each, the new workshop has been built into the shipping lanes of the shipping platform. The length of berth 0 is 30 meters longer. Completed assembly weighs 1700 tons of total slipway, next to the platform, installed next to the berth and slipway platform with the 2 sets up the weight of each of 900 tons of Finland, gantry crane, and wi
您可能关注的文档
- 西南交《混凝土结构设计原理》在线作业一(Southwest China, principles of concrete structure design online homework).doc
- 西南交《建筑工程概预算B》在线作业二(Southwest China construction project budget B online homework two).doc
- 西南交《建筑施工技术C》在线作业二(Southwest China, construction technology C online homework two).doc
- 西南交《建筑施工技术C》在线作业一(Southwest to pay construction technology C online homework one).doc
- 西南交《桥渡设计》在线作业一(Southwest cross bridge crossing design online homework one).doc
- 西门子面板型号及价格(SIEMENS panel model and price).doc
- 西南交《桥梁工程》在线作业二(Southwest China, bridge engineering online homework two).doc
- 西南交《桥梁工程》在线作业一(Bridge project in Southwest China online homework).doc
- 西南交《土木工程概论B》在线作业二(Southwest China, Introduction to civil engineering B online homework two).doc
- 西南交《土木工程概论B》在线作业一(Southwest China, Introduction to civil engineering B online homework).doc
文档评论(0)