提高深井钻井速度的有效技术方法(To improve the effective technology for deep drilling speed).docVIP

提高深井钻井速度的有效技术方法(To improve the effective technology for deep drilling speed).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
提高深井钻井速度的有效技术方法(To improve the effective technology for deep drilling speed)

提高深井钻井速度的有效技术方法(To improve the effective technology for deep drilling speed) Effective technical methods for improving drilling speed in deep well Abstract: This paper analyzes the main problems existing in deep well drilling, puts forward relevant suggestions, and discusses several drilling technology in deep well drilling, in order to improve its drilling speed and reduce drilling costs. Keywords: deep drilling technology speed The achievement of drilling technology in deep and ultra deep wells is one of the marks of comprehensive drilling technology level in a country. Compared with the advanced level of foreign countries, there is still a big gap between deep drilling and ultra deep drilling technology in china. In order to reduce our country in deep and ultra deep drilling technology in the field of the gap with foreign advanced level, improve our deep and ultra deep well drilling technology, should be aimed at main problems and take relevant measures. First, the problems existing in deep drilling Deep well drilling through multi strata, geological age of more and larger changes across these strata, geological conditions of the same section may be perplexing, including the pressure gradient is large and complex formation pressure system formation, the construction of a well to the prevention and treatment of several different kinds of complex underground. Coupled with the deep strata, high temperature, high pressure, high layer stress, etc., will make the complexity of the underground complex and difficult to deal with complex greatly increased. As far as Chinas drilling technology is concerned, the technical problems existing in drilling deep wells are mainly as follows: 1., the main drilling equipment performance is poor, relatively old, and compared with foreign advanced equipment, too far behind. 2., it is a difficult problem to raise drilling speed for large size, well bore and deep well section. Drilling rate of deep hole in slim hole at 3. multi layer ca

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档