近年来我国深基坑工程技术的新进展(New progress of deep foundation pit engineering technology in China in recent years).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
近年来我国深基坑工程技术的新进展(New progress of deep foundation pit engineering technology in China in recent years)
近年来我国深基坑工程技术的新进展(New progress of deep foundation pit engineering technology in China in recent years)
The new progress of deep foundation pit engineering in our country in recent years
In the past 20 years, Chinas large and medium-sized city 000 high buildings, 10 floors above the building more than 100 million square meters; the height of more than 100m of the building about 200 seat. Shanghai Jinmao Tower 420.5m Shenzhen, the most expensive land building 325m, Guangzhou Zhongtian building 322m high, they are among the world 20 super bank list, remarkable. At the same time, these have been built and high-rise building in high building, the depth of excavation has been gradually from the above 6m, 8m, 20m to 10m development. With the implementation of the project, design and construction of deep foundation pit technology has made great progress.
Deep foundation pit engineering called deep excavation engineering in foreign countries (Deep Excavation), which is called the pit is more appropriate. Because in order to set the basement of the building to deep excavation, this is the deep foundation pit excavation of a type. Also includes a deep excavation and must be buried underground facilities to deep excavation. Deep foundation pit engineering problems in our country, with the rapid development of city construction and the emergence of a hot and difficult and have caused people confused.
City of deep foundation pit engineering is often in densely populated both buildings, roads and bridges, underground pipelines, underground tunnels and airraid shelters, although the temporary project, but its technical complexity is far better than permanent base structure or the upper structure, the slightest mistake will not only endanger the foundation pit safety, and will bring disaster to nearby the construction of buildings, roads and bridges and underground facilities, causing huge losses. On the other hand, the excavation of deep foundation pit engineering design to many tec
您可能关注的文档
- 船舶英文(Ship English).doc
- 色标(Color).doc
- 艺术设计系毕业设计((Graduation design of art and Design Department).doc
- 艺术-民间文学艺术保护模式论考(On the protection model of art folk literature and art).doc
- 节能-义立医院(Energy saving Yi Li hospital).doc
- 芦山地震十大不实谣言(Ten false rumors of Lushan earthquake).doc
- 芦荟胶(Aloe Vera Gel).doc
- 节能2(Energy saving 2).doc
- 花卉介绍——口红吊兰(The flower - lipstick).doc
- 花卉园艺考试题(Flower gardening examination).doc
- 这样很好(That's fine).doc
- 这样教育宝宝吧!(So educate your baby!).doc
- 进入系统设置程序(Enter system settings).doc
- 进出口贸易的操作规程和控制节点(Operating procedures and control nodes for import and export trade).doc
- 远离雾霾开始国内十大森林氧吧洗肺之旅(一)(Away from the haze to start domestic ten forest oxygen bar wash Tour (a)).doc
- 进制的故事(Binary story).doc
- 连杆(connecting rod).doc
- 连梁、框架梁、次梁和基础拉梁的区别(The difference between coupling beam, frame beam, secondary beam and foundation pull beam).doc
- 进阶ping的高级用法(Advanced usage of advanced Ping).doc
- 连梁、框架梁和主次梁的区分.doc
文档评论(0)