- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
造价员考试题目及答案(Cost examination questions and answers)
造价员考试题目及答案(Cost examination questions and answers)
Between the cost of examination questions and answers.Txt two feelings like knitting a sweater, a glimmer, careful and long, when the demolition of lightly.... Cost of examination questions and answers
2008-12-17 [small] [Print]
A single choice (professional answer questions)
1. quantities which consists of several parts? (A)
A. by the project quantity list, measures the list of items and other items list of three parts;
B. by the project quantity list, measures to the list of items, a list of other items and sporadic project list.
2. bill of quantities of what constitutes a plan? (C)
A. by the project project cost, project cost, measures of fees and other fees, taxes and unforeseen expenses constitute;
B. by the project project cost, project cost, measures of fees and other fees, taxes, scale of fees, social insurance form.
C. by the project project cost, project cost, measures of fees and other fees, taxes constitute.
What is the definition of the 3. comprehensive unit price? (B)
A. integrated unit refers to the complete bill of quantities in a specified unit of measurement required labor and material costs machinery costs, management fees and profits.
B. integrated unit refers to the complete bill of quantities in a specified unit of measurement required labor and material costs machinery costs, management fees and profits, and risk factors.
4. of the total contract service fee includes these contents? (A)
A. general contracting service fees, unless stated in the bid documents, including the general coordination of project progress, the professional cross operation coordination of the costs incurred, and the cost of materials procurement bidding.
B. general contracting services include coordination, project schedule, with various professional cross operation, scaffolding, subcontractors use main construction vertical transportation equipment, and the cost of repairing hole.
5. Party A is feeding valuation, how to
您可能关注的文档
- 芽孢杆菌属(Bacillus).doc
- 英语成功格言和成语(English Success proverbs and idioms).doc
- 英语复试口试提纲(English interview syllabus).doc
- 英语词汇词根c(English word root c).doc
- 英语课堂导入等过程(English class introduction and so on).doc
- 英语附加疑问句特例(A special case of English tag questions).doc
- 英语词汇词根t(English word root t).doc
- 苹果树的钙营养及补钙技术综述(A review of calcium nutrition and calcium supplementation in apple trees).doc
- 苹果电脑公司的swot分析(SWOT analysis of Apple Com puter Inc).doc
- 苏越(Su).doc
- 造价工程师网络教育(Cost engineer; network education).doc
- 造价员课件-平法钢筋基础(Cost engineer courseware - flat reinforcement foundation).doc
- 造价班16组—名字·太俗(第三章 混凝土结构材料的力学性能)_百度...(Cost 16 - class group name, too (the third chapter material mechanical properties of concrete structure _ Baidu)...Three).doc
- 造气岗位操作规程(Operation rules for gas making post).doc
- 造成ro反渗透膜使用寿命减短的原因(The cause of RO reverse osmosis membrane shortens the service life).doc
- 造纸化学品(Paper chemicals).doc
- 道书十二种-神室八法(There are twelve kinds of Taoist books - eight divine chambers).doc
- 道吾山导游词(Tour guide).doc
- 造价员考试《土建工程》重点知识辅导(Cost staff examination civil engineering key knowledge guidance).doc
- 道岔论文(Turnout paper).doc
文档评论(0)