- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
道路试验段(Road test section)
道路试验段(Road test section)
Filling subgrade construction process and steps: according to the three stage, four section, eight process construction process, organization and construction
The three stage: preparation stage, construction stage, repair and acceptance stage
Four section: filling section, smooth section, rolling section, detection section
Eight process: construction preparation, substrate treatment, layered filling, paving, leveling, sprinkling, drying, rolling compaction, testing subgrade renovation
1, subgrade filling and compaction according to three stages, four sections, eight processes construction process, organization and construction.
2. The base treatment divides the operation section first, and the principle of dividing the section of the operation area is to ensure the construction without interference and prevent the trans regional operation. Each operation section should be 200-300 meters. Then remove the basement surface vegetation, digging roots, for temporary drainage facilities, in situ surface of steep slope in 1:10 area should be the first excavation of lap platform, processing steps, lap width not less than 2 meters platform. Thereafter, the base is leveled and rolled, and the base tests are carried out according to different surface soil with different test methods. After the test has been qualified, the main party can fill the ground.
3. The filling method is based on the full width and vertical horizontal layering of the cross section. Fill the thickness of the virtual laying according to the parameters determined by the test section. Such as scraper construction, according to the thickness of the loose shop once in place; if the use of dump trucks to unload soil, should be calculated according to the capacity of the pile soil spacing, so that the formation of uniform thickness control. In order to ensure the quality of slope compaction, the sides of the subgrade should be widened by 40-50 cm at the time of filling.
4. The paving is
您可能关注的文档
- 草莓栽培知识(Strawberry cultivation knowledge).doc
- 药剂0008注射剂与滴眼剂(多项选择题)(Potion 0008, injection and eye drops (multiple choice questions)).doc
- 荔枝贮运保鲜技术(Storage and storage technology of Litchi).doc
- 药品冲量(Drug impulse).doc
- 药品安全(Drug safety).doc
- 药用辅料(Excipients).doc
- 药学信息检索技术(Pharmaceutical information retrieval technology).doc
- 莫桑钻(Diamond diamond).doc
- 药学专用名词(Special term for pharmacy).doc
- 莲花大生法(Lotus method).doc
- 道路软基处理(Road soft foundation treatment).doc
- 遥感地质学复习总结(Review and review of remote sensing geology).doc
- 道路交叉(Road intersection).doc
- 遥感地学作业模板(Remote sensing geoscience operational template).doc
- 道路勘测实习论文(Road survey practice paper).doc
- 遥感技术在地籍测绘方面的应用(Application of remote sensing technology in Cadastral Surveying and mapping).doc
- 遥感测控(Remote sensing control).doc
- 遥感答案(Remote sensing answer).doc
- 遥控器原理(Remote control principle).doc
- 遥感(remote sensing).doc
最近下载
- 2025年抖音本地生活服务业务深度分析报告 .pdf VIP
- 广西壮族自治区资源县农业局公务员招录事业单位招聘考试录用96人大全(含答案).docx VIP
- 清水河储能电站施工方案.doc VIP
- 2025至2030年中国美甲产业竞争现状及发展前景预测报告.docx
- 《新媒体营销》教学大纲.docx VIP
- 幼儿园小学生姓名卡片姓名贴纸.docx VIP
- 郑州市第四十七中学新初一分班(摸底)语文模拟试题(5套带答案).doc VIP
- 《边城》ppt.ppt VIP
- 2024凉山州专业技术人员继续教育公需科目-提升常态化监管水平,大力发展数字经济,支持平台经济发展试题及满分答案.docx VIP
- 口腔根尖周炎病例分析.pptx VIP
文档评论(0)