- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
保定的供暖困局(Heating dilemma in Baoding)
保定的供暖困局(Heating dilemma in Baoding)
Baoding: heating dilemma under high cost
--------------------------------------------------------------------------------
Time: 2008-11-29 11:23:36 source: Hebei youth daily users comments Click to view
Baodings heating area of 6 million square meters has not been heating on the first day of the heating
In Baoding City, 6 million square meters of heating area is not in the heating heating schedule on the first day
- the government to take decisive measures to ensure the heating area as soon as possible
The heating system - government subsidies still need to explore
November 15th, heating days, Baoding 6 million square metres of heating area has not been scheduled heating. Under the background of rising coal prices in Baoding City, at the beginning of this winter heating is embarrassing situation.
Due to the small area of central heating, the proportion of heating in the area of coal-fired boilers is large, and the heating dilemma caused by the increase of coal prices has been more prominent in Baoding. Faced with the dilemma, the Baoding municipal government resolutely promulgated policies. As of November 25th, after the coordination and commitment of the Baoding municipal government, the heating area failed to start heating on schedule, and the 11 districts are coordinating the settlement.
Although the boiler began to ignite, but the cost of heating enterprises have not been completely resolved, heating enterprises in the loss can persist for how long? Like Baoding, where heating is awkward, how do you deal with heating problems at high cost?
In the Baoding municipal government and the efforts of the relevant departments, in November 24th, a failure of the heating area of the boiler has white smoke, the warm current into the residents of the home late
In the coal pile up eat reassurance to the residents
Present situation
Heating early encounter embarrassment
By November 15th, Baoding 52 districts, 6 million square metres of heati
您可能关注的文档
- windows平台php环境搭建(Windows platform PHP environment built).doc
- windows系统中的路由详解(Routing detail in Windows system).doc
- window文件启动运行(Start running window file).doc
- windwos运行命令(Windwos run command).doc
- witcher支线(witcher支线).doc
- word文档 乱码 处理(Word document garbled processing).doc
- xiaoqinghe(小清河).doc
- xml代码解析与修改(XML code analysis and modification).doc
- xp修改建议(XP change proposal).doc
- wenwen(文文).doc
文档评论(0)