analysis of the tractor gearbox assembly line balancing to improve network _ _ behalf of the thesis(拖拉机变速箱装配线平衡的分析来提高网络代表论文_ _).doc

analysis of the tractor gearbox assembly line balancing to improve network _ _ behalf of the thesis(拖拉机变速箱装配线平衡的分析来提高网络代表论文_ _).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
analysis of the tractor gearbox assembly line balancing to improve network _ _ behalf of the thesis(拖拉机变速箱装配线平衡的分析来提高网络代表论文_ _)

Analysis of the tractor gearbox assembly line balancing to improve network _ _ behalf of the thesis Write papers network: Paper Keywords: assembly line balancing procedures, improve management Abstract: The factor analysis method and quantitative measurement of the assembly line balancing problems, propose improvements. Focused on the key reasons for restricting the production capacity, an implementation of the proposed evaluation method a rate assembly line balancing method for use in small wheeled tractors gearbox assembly line, to get good results. studies have shown that the production process to help achieve a balanced assembly line and scientific management. Assembly line work between the various processes related to the amount of average production process or directly affect the overall efficiency of the bottleneck analysis process, the process of production line is the average production capacity production line to improve the efficiency of the key. Bearing a tractor gearbox assembly line design and production program on the pressure of 8 million units / year (single shift), design and production rhythm of 1.5min, to meet 18.37.101 (standard model) and 20.37.101 (plus wide) two kinds of gearbox assembly operations. Early in the production line, close to 300 day production tasks can not fulfill the plan. Some of the process, there was serious pressure line, off-line phenomenon, and some of the processes of production capacity is also relatively abundant, the presence of the bottleneck process to further increase production tasks, had to rely on a lot of work longer hours to complete, and dampen the enthusiasm of staff, the production and management more difficult. Determined by analyzing the production process does not affect the production line capacity balance is a major factor: the theory and use of production line balancing, and re-allocation process, which established a reasonable production cycle is to solve the key problem of product

您可能关注的文档

文档评论(0)

jiupshaieuk12 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档