graduation feelings and experiences(毕业的感受和经历).docVIP

graduation feelings and experiences(毕业的感受和经历).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
graduation feelings and experiences(毕业的感受和经历)

Graduation feelings and experiences Personal situation: I have 2002 to 2007 studied at the School of Mechanical Engineering, Shandong Nanshan in school was the squad leader, group secretary and other staff, and has been rated as excellent cadres and three good classes since December 2004 when students, internships and worked for six and Machinery Co., Ltd. Kunshan in the hair. internship either during the production technology, production techniques currently play mainly responsible for the company and equipment maintenance and management, new products, product quality, production preparation and analysis of the problem and solution. Company size: The company is located in Kunshan Export Processing Zone was founded in September 2002, covers an area of ??23,750 square meters. Employing about 400 people. The company was formed by the central clockwork Corporation of Japan (80%) and the Kunshan sixty-three Machinery Industry Co., Ltd. (20%) with a 9 million usd to set up this company’s main products are automotive control cables include: cable lock, open the cable, the window controller cables, parking brake cable. The company’s product line Main points dl line (short) and openner line (long). dl line was divided into open wire line and lock the company has been the first line of a dl (including an open line and a lock wire), to today’s 4 dl 2 openner lines and lines. the second phase is under construction. Job performance: I have been engaged in work, in addition to routine equipment maintenance and management to ensure the normal operation of the production line, the main responsible for a third, four dl-line production line and openner2 preparations (mainly equipment installation and commissioning, production of new products trial production) and June 2005 respectively, and went into operation in December. Work experience: I work from the beginning to now been a year and a half, during which I learned a lot, but also realized a number of mainly the following

您可能关注的文档

文档评论(0)

hhuiws1482 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:5024214302000003

1亿VIP精品文档

相关文档