沉井(open caisson).docVIP

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
沉井(open caisson)

沉井(open caisson) Caisson caisson A device for sewage collection, built in the foundation pit, with long arm excavator sinking to a certain elevation, and then jacking together, well tank, cover, lid cast-in-place, density of prefabricated, short construction period. Open caisson foundation is a type of underground structure and deep foundation constructed by open caisson method. Is the first in the structure of the surface is made into a shaft shaped (caisson), and then from the hole in the wall of the enclosure continuously digging under the caisson gradually sinking under the action of gravity, reach the design elevation, then the back cover, the internal structure of building. Widely used in bridges, chimneys, water tower foundation; water pump room, underground oil storage, pool shafts and other deep structures and shield or pipe jacking working well. The technique is more reliable and reliable, less excavation, less influence on adjacent buildings, deeper embedment of caisson foundation, better stability, and larger load support What are the steps and matters needing attention when the caisson is sunk? 1, the caisson should use non drainage, soil subsidence, drainage can also be used to remove soil subsidence. But when using drainage to remove soil, there should be safety measures to prevent all kinds of safety accidents. 2 it is not suitable to use blasting method when sinking deep well. Under special circumstances, when approved, blasting must be strictly controlled. 3 in the process of subsidence, soil condition should be mastered at any time, record of subsidence observation should be carried out, and the relationship between soil resistance and caisson gravity should be analyzed and checked, and the most favorable subsidence method will be chosen. 4 sink through clay cementation layer or caisson itself, gravity is lighter, sinking is difficult, Well, can be used to reduce the water level in the well of high pressure water jet method of sinking. Under the c

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档