- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
沉箱回填(Caisson backfill)
沉箱回填(Caisson backfill)
Proper method of filling caisson toilet
Light filling technology in toilet
First, the craft Name: toilet light backfill
Two 、 scope of application: caisson type toilet
Three, process characteristics: Backfill light, no damage to the pipeline
Four, the use of materials: cement, ceramsite, phi 6 rebar, wire grid
Five, use tools: spades, ash knives
Six, construction sequence:
Clean up and fixed into a drainage pipe caisson, ceramsite and cement mixing, compaction, filling with iron wire mesh leveling
Seven, operating rules:
1. before the light backfill is carried out, the caisson shall be cleaned and the water inlet and outlet pipe shall be secured so as to avoid touching the pipe in the backfill.
2. the proportion of ceramsite and cement is recommended as 5:1.
3. the bottom to make two drainage water using ceramsite, according to the box base or intermediate to two emissions drain.
4. caisson backfill is about 4/5, about 30mm-60mm cement mortar leveling, compaction to. If placed in the bathtub, must add phi 6 bars made of 20cm grid.
The last 5. plus barbed wire with 1:3 cement mortar leveling, put the slope as a waterproof base.
Eight, quality requirements:
1. pipe fixed, firm.
2., the proportion of ceramsite and cement should be accurate, add water accurately, mixing evenly.
3. the wire mesh joint shall overlap over 100 mm.
Nine, matters needing attention:
1. press tight, but dont step on the pipe.
Two
Backfill should be dense.
3., wire and cement mortar to be integral, pay attention to cement mortar to find the usual slope.
4., pay attention to the ground floor elevation of the toilet, should not be higher than the aisle or room floor.
66 2009-10-20 12:58
Ceramsite can also use light brick instead of, but can not be used instead of bricks, bricks for free to fill more wrong. The principle of backfill is light weight and does not damage the pipe.
66 2009-10-20 14:05
Step 1: do two times waterproof coating, these two times waterproof must be don
您可能关注的文档
- 水与人类健康(Water and human health).doc
- 氯气的实验室制法(Laboratory method for chlorine gas).doc
- 氯离子选择性电极测定水中氯含量(标准加入法)(Determination of chlorine content in water by chlorine ion selective electrode (standard addition method)).doc
- 水产药物与药理学思考题6(Thought of aquatic medicine and pharmacology 6).doc
- 水利八(Water conservancy eight).doc
- 水冷空调(Water-cooled air-conditioning).doc
- 水中离子测定(Determination of ion in water).doc
- 水利生产知识生产20140709(Knowledge production of water conservancy production 20140709).doc
- 水友技术帖浅析dota和lol的主要不同(Water friends technical posts analysis of the main differences between dota and lol).doc
- 水变成蒸汽所需的热量(The amount of heat needed to turn water into steam).doc
- 沉香价值(Value of aloes).doc
- 沉默的羔羊 影评 经典对白(Silent lamb dialogue).doc
- 沐子食谱(Mu recipes).doc
- 沙格列汀fda原版使用说明书最新版(Shah Glenn Dean FDA original manual, latest version).doc
- 沙棘十大功效(Ten functions of Seabuckthorn).doc
- 沙棘果油 沙棘甘之福软胶囊(Seabuckthorn fruit oil, sea buckthorn sweet soft capsule).doc
- 沉积岩试题大全(Sedimentary rock examination questions).doc
- 沙龙操作服务流程(Sharon operation service process).doc
- 没有人天生就是成功者(No one is born a success).doc
- 没说国企改革该停(Did not say that state-owned enterprises reform should stop).doc
文档评论(0)