- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
全贴合气泡分析和经验总结V3
XXX project full lamination bubbling
problem analyse report and lesson
learned
Problem description
34.15% failure rate of bubble issue were detected during full lamination trial
run using Mitsubishi PMI G6.2 OCA.
Date Full lamination QTY Deaeration times Bubbling piece QTY Failure rate
2013-7-19 30 1st,2nd,3rd 5 16.67%
2013-7-19 30 1st,2nd,3rd 17 56.67%
2013-7-20 27 1st,2nd 16 59.26%
2013-7-23 63 1st,2nd,3rd 12 19.05%
2013-7-24 59 1st,2nd,3rd 14 23.73%
2013-7-24 30 1st,2nd,3rd 17 56.67%
2013-7-30 30 1st,2nd,3rd 9 30.00%
2013-7-30 26 1st,2nd,3rd 6 23.08%
2013-8-2 30 1st,2nd,3rd 15 50.00%
325 111 34.15%
*
Relation part Description
Step between TP ink edge line and TP
VA frame edge line for M8047SA black
TP
Image size Scale Actual Size(MM)
0.1336 4 0.0334
0.1431 4 0.0358
Phenomenon description 1 on PMI G6.2 OCA
TP VA frame
TP VA frame
edge line
edge line
1. Most of bubbles are obser
您可能关注的文档
- 光学零件制造.pdf
- 光谱仪和光谱的观察与LED发光光谱测量.pdf
- 光缆布线应用介绍20150716.pdf
- 光谱EPOCH 25&SPFS RTK操作手册.pdf
- 光通信用光电探测器基础.pdf
- 克亚营销全集笔记汇总.pdf
- 光谱学 综合解析.pdf
- 光通信用光电子器件结构、工艺和性能.pdf
- 光路计算与近轴成像.pdf
- 光记录原理(第三章).pdf
- 太原科技大学线性代数题库及真题.docx
- 隧道监理规划.docx
- 水塔拆除人工拆除施工方案.docx
- 塔吊超长附墙杆件设计、安装专项施工方案1023.docx
- 隧道风、水、电管线布置方案.docx
- 已发布五路虎range rover sport原厂l320 l494空调.pdf
- 湖北省五市州2023-2024学年高一下学期期末联考英语Word版含解析.docx
- 湖北省五市州2023-2024学年高二下学期期末联考政治试卷Word版含解析.docx
- 湖北省五市州2023-2024学年高一下学期7月期末考试化学试卷Word版含解析.docx
- 湖北省五市州2023-2024学年高一下学期期末联考历史试卷Word版含解析.docx
文档评论(0)