外墙涂料施工工艺(Construction technology of exterior wall coating).docVIP

外墙涂料施工工艺(Construction technology of exterior wall coating).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
外墙涂料施工工艺(Construction technology of exterior wall coating)

外墙涂料施工工艺(Construction technology of exterior wall coating) This article is contributed by liwenbao85 DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. 1 the construction preparation base material requirements: plaster base has been completed and maintained for about 20 days, the alkalinity pH below 9 in the base, at the same time base has been drying (at least 15 days has been dry, humidity is lower than 8%); smooth surface, yin and yang angle and angle line of dense, chiseled; surface water seepage, cracks hollowing and foaming hole structure. No powder, no oil, grease, and other adhesive substances. II. The outer wall reserved joints have been waterproof and sealed. The used coating has the certificate of ex factory and at the same time, it meets the relevant national standards and requirements. The coating is approved by the owner, and the sample wall is approved by the owner, the supervisor and the design unit. Decorative scaffolding has been erected. The primary exposure iron has good anti rust treatment corresponding (galvanized or brush rust. The construction conditions: exterior wall paint is due to waterborne coatings, high requirements for construction and maintenance conditions. Construction and maintenance requirements of temperature higher than 5 degrees, environmental humidity of less than 85%, in order to ensure good film formation. Low temperature will cause paint film powder, cracking and other issues, the environment humidity Ambassador paint film for a long time not dry, and eventually lead to poor film formation. External wall construction must take into account the weather factors, before brushing the paint, 12 hours without rain, to ensure that the grass-roots drying, brushing after 24 hours can not rain, to avoid the paint film was washed down by rain. 2, exterior wall coating construction method, this project exterior wall coating coating sys

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档