- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
安规案例分析(Safety regulation case analysis)
安规案例分析(Safety regulation case analysis)
Two, part of the line:
Case 1: electric shock death of line maintenance personnel (safety report, 2005 second)
Accident passing:
In February 26, 2005, the line maintenance class 110kV sun #1 #15 chicken east tower, the fastening bolt wire insulator cleaning (#1 #14 tower and West Tower with sun chicken chicken, sun west live operation). 10:51, the line work team in sun chicken on the East, 1, 15 towers were hung, ground wire, the work of the person in charge of Liu * * * inform each group can work on the tower. The line maintenance is divided into five groups, Xiong x (the deceased, the tower personnel), Wang x (on-site ground care personnel) in the second group, responsible for sun chicken east #4 - #6 tower inspection. Before the tower, Wang x again on the Bear * made the western line electrification, east line repair account. 10:54, bear * from D (power line side leg by a pin), from the lower to the upper work. Bear * after work, tell Wang X: I have finished cleaning.. Wang * replied, OK.. Wang no longer monitor the bear under the tower, from the satchel out of standard work instructions, began to check the foundation of the #5 tower. 11:12, Wang x is checking the A leg grounding wire, heard the sound of electricity, looked up to see the Bear * fell in the sun did not power the chicken in the west of the horizontal cross load, the body has caught fire. When rescued, bear X has died.
Accident cause:
1., the operator on the tower has not strictly implemented the work ticket, the construction three measures, the dangerous spot analysis, the standardized work instruction related regulations, unauthorized access to the electrified area, is the direct cause of the accident.
The 2. tower monitoring personnel monitoring is not in place, the tower operators has not been under the tower before the start of other work, not the whole process monitoring of tower staff, which fails to act in violation of regulations of workers on the tow
您可能关注的文档
- 医药保健品, otc市场正上演终端大战(Health care products, OTC market is staged terminal war).doc
- 医药学专业大学生职业生涯规划书论文(Career planning for college students majoring in medicine).doc
- 医药代表医院开发全过程记录(Medical representative record of whole process of hospital development).doc
- 医药经销商如何选择产品(How do pharmaceutical distributors choose products).doc
- 医药杂志编辑部稿约(The editorial department of Journal of Medicine).doc
- 区域经理管理的困惑(The perplexity of regional manager management).doc
- 医药行业集团型企业的信息化需求分析管理(Information needs analysis and management of pharmaceutical industry group enterprises).doc
- 医药行业新产品立项管理规范化(Standardization management of new products in pharmaceutical industry).doc
- 医药行业整合提速 玩转价值链才能走得远(Pharmaceutical industry integration speed, fun value chain in order to go far).doc
- 医院如何开展一对一营销管理(How to carry out one-to-one marketing management in hospital).doc
最近下载
- 景观照明设施养护投标方案技术标.docx
- 广东省江门市第一中学2024-2025学年高一上学期第二次月考物理试题(含答案).pdf VIP
- 矿山机械与智能化技术 课件全套 马立峰 第1--8章 绪论---智慧矿山的关键技术及展望.pptx
- 卒中患者吞咽障碍护理规范.docx VIP
- 矿山机械与智能化技术 课件 第1章 绪论 .pptx
- 慎独班会课件PPT.pptx VIP
- DB11T2382-2024 建设工程施工消耗量标准.pdf VIP
- 混合精度稀疏矩阵加速计算脉动阵列架构及数据处理方法.pdf VIP
- 《商业模式》练习题及答案.docx VIP
- 人教版2024四年级上册英语 Unit 5 The weather and us A 第3课时 课件.pptx VIP
原创力文档


文档评论(0)