拿什么来监督和管理我们矿山的损失和贫化率(What will be done to monitor and manage the loss and dilution rates of our mines).docVIP

  • 1
  • 0
  • 约1.04万字
  • 约 8页
  • 2017-10-07 发布于河南
  • 举报

拿什么来监督和管理我们矿山的损失和贫化率(What will be done to monitor and manage the loss and dilution rates of our mines).doc

拿什么来监督和管理我们矿山的损失和贫化率(What will be done to monitor and manage the loss and dilution rates of our mines)

拿什么来监督和管理我们矿山的损失和贫化率(What will be done to monitor and manage the loss and dilution rates of our mines) What will be done to monitor and manage the loss and dilution rates of our mines? prospector Everyone knows that if a mine wants long-term development and strives for maximum profit of mine enterprises, it is necessary to control the loss and dilution of the whole mine! But, from the overall point of view! First of all, in the current economic conditions, generally speaking, geological data provided by geological prospecting units, especially grade and reserves, are water to some extent! Often appears in the mining, geological grade of actual geological grade than the original submitted to lower! In a mining area of mining right, mine enterprises must provide to meet the dilution index of the whole national saving and utilization of mineral resources. In this case, the indicators of poverty reduction for mining rights are often far from the actual indicators of poverty reduction in the mining process. What should I do if the miners buy mine rights? Allocated to subsidiaries, subsidiaries in the early days of substantial investment in infrastructure costs, almost all projects are contracted to the construction unit. I only work as a supervisor and manager. How can we supervise and manage these jobs at this time? Especially the necessary and important economic indexes of mines. Such as the production, ore grade, loss rate, dilution rate, recovery rate and labor productivity, etc.. Determine root cause annual output is really a mine reserves, reserves are determined, then determine a mining scale is large, medium or small, or, after determining a mining scale, decide on a mine infrastructure projects such as: enhance transport capacity, including the adit. Ramp, air shaft, main and auxiliary shaft, main and auxiliary chute system. Prior to this, we must also find out the geological conditions of the mining area, such as a certain metal copper mine, the geological rese

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档