脚手架工程量计算(Calculation of scaffold quantity).docVIP

  • 3
  • 0
  • 约1.24万字
  • 约 10页
  • 2017-10-07 发布于河南
  • 举报

脚手架工程量计算(Calculation of scaffold quantity).doc

脚手架工程量计算(Calculation of scaffold quantity)

脚手架工程量计算(Calculation of scaffold quantity) How are the scaffolding works calculated? Answer: comprehensive scaffolding works volume calculation, according to the construction area calculation rules to calculate the area, individual scaffolding words. This chapter is made up of fastener type steel pipe scaffold and wooden foot board, and in actual construction, no matter what material should be adopted, it should be calculated according to the provisions of this chapter. The composite scaffold is suitable for calculating the construction area of mixed structure, concrete frame, bent structure and other buildings, does not apply to the construction of Slipform construction. Individual scaffolds are suitable for structures and buildings not suitable for integrated scaffolding. I. integrated scaffolding 1. comprehensive scaffolding have included in the foundation, exterior wall masonry, concrete, cast-in-place cast-in-place concrete framework of scaffolding lift shaft, inside and outside decoration, the basement waterproof wall, installation and installation of prefabricated metal components required. If the building body and the internal and external decoration by different construction units, for the main project of this chapter apply scaffolding scaffolding scaffolding for the corresponding single project, and interior decoration engineering project to corresponding B.7 scaffold in engineering. 2. in accordance with the comprehensive scaffolding calculation, in the following cases, with the corresponding individual scaffolding. (1) equipment foundation with a base area of more than 4m2 or more than 1.5m depth; (2) an interior channel wall with a height exceeding 1.2m; (3) elevator installation; (4) attachment ramps; 3., integrated scaffolding in multi-storey buildings, storey height is considered within 3.6m. When storey height exceeds 3.6m, comprehensive scaffolding cost should be increased. Comprehensive scaffolding height of more than 3.6m to increase the cost of

文档评论(0)

1亿VIP精品文档

相关文档