公路施工(Highway construction).docVIP

  • 8
  • 0
  • 约1.68万字
  • 约 14页
  • 2017-10-05 发布于河南
  • 举报
公路施工(Highway construction)

公路施工(Highway construction) Base on the hard rock and weathered rock area with 15 cm of cement stabilized gravel embankment, according to different types of dry and wet, dry, wet and wet sites were 15, 18 and 20 cm stabilized soil and cement stabilized macadam, cement stabilized crushed stone base by 34cm. 1, cement stabilized macadam construction program is as follows: (1) subgrade inspection; By the owners, supervision units in conjunction with the roadbed and pavement construction of subgrade to delivery strict acceptance, acceptance include: compaction, deflection, elevation, slope, roughness, transverse width, midline deviation of a total of seven, a serious and meticulous examination, meet the requirements after receiving. (2) survey lofting; Setting out principle: straight line section 20 meters, curve section 10 meters, center line pile and side pile. Measurements are taken by closed measurements. Third, after setting out sprinkle lime line, including the gray line line, line (two), hilling soil shoulder line of position (two), guide the paver to line a total of 7 (two). (3) the earth According to the test results of the test section, artificial shoulder up. (4) cleaning and sprinkling wetting of the lower support surfaces; Before paving, thoroughly clean the lower bearing surface, make sure there is no sundries on the lower bearing surface. After the cleaning is completed, prepare the construction and look forward to the roadbed before wetting. (5) hanging steel wire According to the elevation data measurements to determine the hanging wire rope, steel wire, flat tightness of pavement of impact, the tight wire wire tension, and take the weight method (wire hanging 5kg weight makes the wire deflection is less than 5cm to test the tightness of the wire). The location of steel wire must be bound by lashing wire. Hanging steel wire cross-section as follows: (6) mixing and transportation The mixing of cement stabilized crushed stones shall be carried out in stric

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档