- 1、本文档共19页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
左弯待转区
Analysis on Waiting Area for Left-turn Vehicles at Signalized Intersections Yongheng Chen, PhD Transportation Colloege Jilin University The People’s Republic of China cyh2009@163.com JILIN UNIVERSITY Outline What’s WAFLT Left-turn spillback After setting WAFLT Timing condition JILIN UNIVERSITY What’s WAFLT A new type of channelization Increasing use Lack of methods to design and analyze them JILIN UNIVERSITY WAFLT The rule of WAFLT Lagging protected left-turn phase When the green time of through phase begins at the same approach, the left-turn vehicles start to run into the waiting area for left-turn and wait to complete their turning movement in green time for left-turn. JILIN UNIVERSITY WAFLT JILIN UNIVERSITY The contrast of non-spillback and spillback at approach A JILIN UNIVERSITY Left-turn queue accumulation polygon (case 1) The queue of left-turn vehicles overflows the left-turn lane during tr time. JILIN UNIVERSITY Left-turn queue accumulation polygon (case 2) The queue of left-turn vehicles overflows the left-turn lane during gT time. JILIN UNIVERSITY Left-turn queue accumulation polygon (case 3) There is no spillback occurred. JILIN UNIVERSITY The change after setting WAFLT Case1 Case2 Case3 Case4 JILIN UNIVERSITY The sketch of conflict points JILIN UNIVERSITY Timing condition(绿尾滞留) For conflict point 1 For conflict point 2 Minimum green time JILIN UNIVERSITY Longer signal interval time New condition E N D THANK YOU JILIN UNIVERSITY Case 1 Before the left-turn vehicles overflow the left-turn lane, the left-turn queue forming during tr has started into the waiting area, which indicates that the capacity of left-turn lane increases to N*. Meanwhile, due to N*≥Q2, the queue of left-turn does not spill back and other vehicles release smoothly during the gT time. The spillback problem is solved by setting WAFLT. Case 2 However, due to N*Q2 the left-turn queue overflows the left-turn lane after t*u. The duration of left-turn spillba
您可能关注的文档
- 工程投标提交报告.doc
- 工程断裂力学第二章(矿大)new.ppt
- 工程施工专业分包合同(2016.7.19修).doc
- 工程断裂力学第五章(矿大)new.ppt
- 工程机械设计_吴永平_第三篇工程机械整机设计第七章水泥混凝土路面摊铺机.ppt
- 工程断裂力学第四章(矿大)new.ppt
- 工程材料(苏旭平主编)课件 工程用钢.ppt
- 工程学教案(3.6).doc
- 工程样板引路作业指引.doc
- 工程力学第三章课件力系的平衡.ppt
- 金融产品2024年投资策略报告:积极适应市场风格,行为金融+机器学习新发现.pdf
- 交运物流2024年度投资策略:转型十字路,峰回路又转(2023120317).pdf
- 建材行业2024年投资策略报告:板块持续磨底,重点关注需求侧复苏.pdf
- 宏观2024年投资策略报告:复苏之路.pdf
- 光储氢2024年投资策略报告:复苏在春季,需求的非线性增长曙光初现.pdf
- 公用环保2024年投资策略报告:电改持续推进,火电盈利稳定性有望进一步提升.pdf
- 房地产2024年投资策略报告:聚焦三大工程,静待需求修复.pdf
- 保险2024年投资策略报告:资产负债匹配穿越利率周期.pdf
- 政策研究2024年宏观政策与经济形势展望:共识与分歧.pdf
- 有色金属行业2024年投资策略报告:新旧需求共振&工业原料受限,构筑有色大海星辰.pdf
文档评论(0)