预应力锚索与非预应力锚杆在同一锚固格构优化设计——以柳州市桃花源保障性住房工程1号不稳定边坡为例-optimal design of prestressed anchor cable and non-prestressed anchor cable in the same anchorage lattice - taking no.1 unstable slope of taohuayuan indemnificatory housing .docxVIP

  • 5
  • 0
  • 约4.47万字
  • 约 83页
  • 2018-06-05 发布于上海
  • 举报

预应力锚索与非预应力锚杆在同一锚固格构优化设计——以柳州市桃花源保障性住房工程1号不稳定边坡为例-optimal design of prestressed anchor cable and non-prestressed anchor cable in the same anchorage lattice - taking no.1 unstable slope of taohuayuan indemnificatory housing .docx

预应力锚索与非预应力锚杆在同一锚固格构优化设计——以柳州市桃花源保障性住房工程1号不稳定边坡为例-optimal design of prestressed anchor cable and non-prestressed anchor cable in the same anchorage lattice - taking no.1 unstable slope of taohuayuan indemnificatory housing

AbstractAfter the industrial revolution in modern times, especially after the end of World War II, the world economy began a slow recovery, the human substance life culture increased along with the continuous development of the world economy . Especially in late twentieth Century and early twenty-first Century,the relationship between supply and demand is more significant,in order to meet the needs of people for the material life and culture. The pace that the human exploit the natural resources and change the ecological environment is further accelerated, and the destruction of the natural environment is also more and more rampant. In china,mainly by the development of the first industries which is low level, energy dissipation, pollution and heavy industry, in order to develop the economy most parts of the country are the cost of the environment damage without restraint.The bad geological phenomenon, likely man-made slope instability, mines and excavation of foundation pit ,can be seen everywhere, lead to the rising economic losses.For the slope reinforcement, today is mainly used in supporting and retaining structure and anchorage structure. Because the slope is very complex and there are many special geological conditions, at the same landslide treatment time, most experts or criterions are partial to conservative and do not approve to fill the different stress structure on the same landslide .But in the practical work, the special conditions occur with only using the active force and passive force structure mean whilely .Through the latter observation, simultaneously after using the two kinds of structure brings the better real effect, saves time and effort, and makes the human disturbance on natural environment to be minimum.There is few previous studies about the common use with the two kinds of force structure on the same side slope treatment. This paper no only focuses on the issue and mades some analysis and research, but also gains some new understanding.

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档