通—胡区间隧道暗挖施工对既有桥梁桩基础变形影响规律-influence law of tunneling construction on pile foundation deformation of existing bridges in tonghu section tunnel.docxVIP
- 2
- 0
- 约5.66万字
- 约 70页
- 2018-08-07 发布于上海
- 举报
通—胡区间隧道暗挖施工对既有桥梁桩基础变形影响规律-influence law of tunneling construction on pile foundation deformation of existing bridges in tonghu section tunnel
Subject:TheInfluenceLawoftheExistingBridgePileFoundationCausedbytheTunnelingConstructionofTong-HuRunningTunnelSpecialty:ArchitectureandcivilengineeringName:HeXiaoli(Signature)Instructor:RenJianxi(Signature)LiuPeilin(Signature)ABSTRACTIthassignificanttheoreticalmeaningandengineeringreferencetostudytheinfluencelawoftheexistingbridgepilefoundationcausedbytheshallow-coveredexcavationofmetrotunnelinXi’anloessarea.Thispaperbasedonprojectofshallow-coveredexcavationofthesectiontunnelfromTonghuamentoHujiamiaorailwaystationinXi’anMetroLine3.Thestudyworkofthisthesisisadoptingthecombinedmethodoftheoreticalanalysis,numericalsimulationandfieldconstructionmonitoring,andthecorrespondingcontroltechnologyondeformationisputforward.Themainworkandconclusionsarefollowed:(1)Theinfluencelawofsurfacedeformationaffectedbysomefactorsandthecharacteristicsofgrounddeformationcausedbytheshallow-coveredexcavationareanalyzedtheoretically,theinfluencingfactorsmainincludeformationcharacteristic,groundwater,tunneldepth,constractionway,excavationdriving,etc.Theresultsshowthatthedeepertheadjacentpilefoundationis,theeasierthefoundationinclinedwhichcausedbyshallow-buriedsub-surfaceexcavatedtunnelconstruction,meanwhile,theshallow-buriedsub-surfaceexcavatedtunnelconstructioninducedgrounddeformation,andthedeformationofbridgepilefoundationwithdifferentformsismainlycausedbymeansofthehorizontaldeformationandverticaldeformation.Thispapersummarizessomecontrolmeasuresforthedeformationofsurfaceandbridgepilefoundationwhichcommonlyusedintunnelingconstruction,andcombinedwiththeconstructionexperienceinXi’anarea,thenputsforwarddeformationcontrolstandardofsurfaceandbridgepilefoundationthatcausedbythetunnelingconstructionofTong-Hurunningtunnel.Studyontheinfluencelawoftheexistingbridgepilefoundationcausedbythetunnelingconstructionoftong-hurunningtunnelbyusingofFLAC3Dsoftware.AcomparativeanalysisoftwokindsofundergroundexcavationconstructionmethodsinducedthedeformationLawsofsurfaceandChangleBridgeofEast2ndRingRoad,andbenchme
您可能关注的文档
- 替米沙坦通过影响hif 1α的表达抑制肾脏纤维化的进展-telmisartan inhibits renal fibrosis progression by affecting hif 1α expression.docx
- 脱毒马铃薯原原种栽培基质的分析与应用-analysis and application of virus-free potato original seed culture medium.docx
- 无机盐镁橄榄石复合相变蓄热材料的制备与性能分析-preparation and performance analysis of inorganic salt forsterite composite phase change thermal storage material.docx
- 提锂杂化膜制备及提锂性能分析-preparation of lithium extraction hybrid membrane and analysis of lithium extraction performance.docx
- 铁路货运社会运力整合管理系统研究与设计-research and design of railway freight transportation social transportation capacity integration management system.docx
- 微细粒级黑钨矿浮选动力学分析-flotation kinetics analysis of fine grained wolframite.docx
- 铜引线键合工艺中焊盘内伤失效机理分析和改进-failure mechanism analysis and improvement of bond pad internal injuries in copper wire bonding process.docx
- 肟 羟肟酸和酰氨基硫脲金属配合物的合成 结构及性质分析-synthesis structure and properties analysis of metal complexes of hydroxamic acid and acylthiosemicarbazone.docx
- 陕北生土民居与闽南生土民居的地域性对比分析——浅论新型窑洞给土楼的再生带来的启示-comparative analysis of the regions between northern shaanxi and southern fujian adobe dwellings - on the inspiration of new cave dwellings to the regeneration of adobe buildings.docx
- 贴片瓷介电容微器件装配联动机控制系统的分析与实现-analysis and implementation of control system for assembly linkage machine of patch porcelain dielectric capacitor micro - device.docx
原创力文档

文档评论(0)