- 1、本文档共49页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
公共建筑无人值守换热机组节能控制的研究控制科学与工程专业论文
公共建筑无人值守换热机组节能控制的研究
公共建筑无人值守换热机组节能控制的研究
河北工业大学硕士学位论文
河北工业大学硕士学位论文
PAGE
PAGE iv
iii
iii
Research On Energy-Saving Control Of Public Building Unmanned Heat Transfer Uint
ABSTRACT
With the computer technology and the rapid development of automatic control technology, as well as rising labor costs in the industrial and agricultural production, the production of defense equipment used with a large number of unattended operation mode. Ensure that these facilities operate safely on the national economy is of great significance. As peoples lives, public buildings, office and entertainment venues, is no exception. In this paper, Songyuan City, Jilin Province in the design of four unattended heat transfer stations, a savings of manpower, but also improve the management of high energy consumption and backward.
In this paper, heat transfer control station and control center combination, the focus adjustment to achieve the heating of public buildings. Heat transfer station controller using ACX32 collection pipe network with a heating system, secondary supply and return water pipe network pressure, temperature, outdoor temperature and other parameters, the best obtained through the operation controller PID control scheme to regulate the solenoid valve to open a network degrees to achieve the water temperature control. Installed in all buildings by controlling the shut-off valves, to achieve a stage in the building without heating, by closing the throttle to return the excess heat water, return water temperature to improve the secondary network, reduce the heat supply to save energy.
Design data is divided into two parts, one is the heat transfer station site collection of data transmission via Ethernet ring network to the monitoring center, on the other hand, the monitoring point spread, classrooms, libraries and other public buildings, the buildings of the shut-off valves real-time data and control data transmitted to the monitoring center through the GPRS.
Aspects of the d
您可能关注的文档
- 供热系统事故工况下运行调度策略的研究-供热、供燃气、通风及空调工程专业论文.docx
- 供热系统可靠性相关问题的研究-建筑与土木工程专业论文.docx
- 供热系统监测与控制改造技术研究-供热、供燃气、通风及空调工程专业论文.docx
- 供热系统联网运行方案与水力工况分析-建筑与土木工程专业论文.docx
- 供热网温度监测系统的研制机械电子工程专业论文.docx
- 供热锅炉网络化控制系统的分析和分析-控制理论与控制工程专业论文.docx
- 供热锅炉网络化控制系统的分析和研究-控制理论与控制工程专业论文.docx
- 供用电稽查企业绩效管理体系研究-工商管理;企业管理专业论文.docx
- 供电企业10kv以下线损管理系统的设计与实现-软件工程专业论文.docx
- 供电企业信息资源整合平台研究与应用-软件工程专业论文.docx
- 2024-2025学年人教版小学数学四年级下册教学计划及进度表.docx
- 2024-2025学年北师大版小学数学二年级下册教学计划及进度表.docx
- 2024-2025学年人教版小学数学五年级下册教学计划及进度表.docx
- 2024-2025学年人教大同版(2024)小学英语三年级下册教学计划.docx
- 2024-2025学年人教精通版(三起)(2024)小学英语三年级下册教学计划.docx
- 2024-2025学年统编版初中道德与法治八年级下册教学计划及进度表.docx
- 2024-2025学年统编版(2024)初中道德与法治七年级下册教学计划及进度表.docx
- 2023-2024学年上海黄埔区中考二模综合测试(物理部分)试卷及答案.pdf
- 2024-2025学年外研版(三起)(2024)小学英语三年级下册教学计划及进度表.docx
- 2025届北京市北京第四中学高三冲刺模拟数学试卷含解析.doc
文档评论(0)