网站大量收购闲置独家精品文档,联系QQ:2885784924

复杂条件下流水施工组织优化研究-管理科学与工程专业论文.docx

复杂条件下流水施工组织优化研究-管理科学与工程专业论文.docx

  1. 1、本文档共74页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
复杂条件下流水施工组织优化研究-管理科学与工程专业论文

万方数据 万方数据 ABSTRACT RESEARCH ON FLOW CONSTRUCTION ORGANIZATION OPTIMIZATION UNDER COMPLEX CONDITION ABSTRACT In recent years, Chinas construction industry is in ascendant, market competition is growing, people gradually began to pay attention to how to get the project a high quality objectives within a predetermined completion, reduce project cost, improve the benefit. Especially the water conservancy project, because the project usually in a long duration, the scale of capital investment is huge, more works are involved , the construction condition is variable, and is easily affected by the surrounding environment, so how to determine the construction organization arrangement is very complex, and it is also difficult to design. At the same time, the lack of a comprehensive and effective optimization theory and method which is one of the reasons of effective progress of construction management level. This paper has carried on the analysis and Application Research on Optimization and modeling of the flow construction organization design under complex conditions. The research achievements are as follows: Described in the project life cycle, capital investment in the construction stage of water conservancy project is the largest, so the construction organization design of this phase are of great significance to the optimization of the whole process control of construction investment of resources. Describes the function relation between the time and the cost, to lay the foundation for the establishment of the model. Establish the relationship model between the water under the condition of the complex rhythms and resources, and optimize the research from the two aspects of construction time and cost, the optimization results under different conditions were discussed and summarized in this paper. The genetic algorithm combined with heuristic, and made the quantitative analysis on how to reasonable arrangement of resources in the construction of the investment. Genetic algo

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档