堤防工程风险评价方法研究水工结构工程专业论文.docxVIP

堤防工程风险评价方法研究水工结构工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
堤防工程风险评价方法研究水工结构工程专业论文

AbstractAbstract Abstract Abstract The cause of levee risk is complex.At present,no ideal methods are found to evaluate levee risk.Based on the risk analysis model of the levees,the method of assessment iS studied in this P印er.The main contents are described as follows: (1)The risk factors of the levees material,construction,operation,and daily maintenance etc are analyzed.Taking typical levee accident model as example,levee risk factors are mined,and then network system of risk factors analysis iS established. (2)The qualitative risk factor is quantified by introducing blind data.Index consistent problem of judgment matrix is improved in analytic hierarchy process by using G I to calculate weighting.Based on the quantification and weighting of risk factors,the risk analysis model of risk factors combination iS established. (3)Based on general reliability theory,finite element calculation model and rigid body limit equilibrium method,the risk analysis models of levee overtopping,seepage failure and slide instability failure are constructed individually.The precision of random risk analysis model of seepage failure is improved by using incipient fault value. (4)The IOSS calculation of levee failure impact from lOSS of life.economy and environment are analyzed.And then the criterion of loss severity degree is discussed accordingly.Finally,the risk assessment criterion is presented. (5)According to certain levee section of yellow river,the risk degree is analyzed. On the basis of the analysis result,a preliminary evaluation for the levee is made. Keywords:levee construction,risk analysis,stochastic risk, analytic hierarchy process(AI-IP),risk assessment 学位论文独创性声明: 学位论文独创性声明: 本人所呈交的学位论文是我个人在导师指导下进行的研究工作 及取得的研究成果。尽我所知,除了文中特别加以标注和致谢的地方 外,论文中不包含其他人已经发表或撰写过的研究成果口与我一同工 作的同事对本研究所做的任何贡献均已在论文中作了明确的说明并 表示了谢意。如不实,本人负全部责任。 论文作者(签名): 1 塑w诏年 V月心El 学位论文使用授权说明 河海大学、中国科学技术信息研究所、国家图书馆、中国学术期 刊(光盘版)电子杂志社有权保留本人所送交学位论文的复印件或电 子文档,可以采用影印、缩印或其他复制手段保存论文。本人电子文 档的内容和纸质论文的内容相一致。除在保密期内的保密论文外,允 许

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档