大跨度预应力混凝土无碴轨道连续梁桥后期徐变变形的研究结构工程专业论文.docxVIP

  • 8
  • 0
  • 约5.89万字
  • 约 150页
  • 2019-01-30 发布于上海
  • 举报

大跨度预应力混凝土无碴轨道连续梁桥后期徐变变形的研究结构工程专业论文.docx

大跨度预应力混凝土无碴轨道连续梁桥后期徐变变形的研究结构工程专业论文

AB AB STRACT Amount laying of ballastless track on high speed railway has become trend.It iS very difficult to ensure the smoothness of the track because the height of the track can be adjusted little without ballast. Therefore,it iS necessary to know and control the creep deformation of concrete bridges after laying track,namely post creep deformation. According to the mechanism of shrinkage and creep,the influences factors of shrinkage and creep,the calculation of creep coefficients,the basic methods of shrinkage and creep the post creep deformation of a long span prestressed concrete continuous beam bridge which iS on Guangzhou to Zhuhai intercity rail traffic engineering has been calculated. The major work of this Paper is as follows: 1.The calculated ere印coe伍cients according to the formularies in the several current codes were compared with the measured values.The results showed that the ere印coefficients of Chinese Railway 05 Code and Chinese Highway 04 Code are both greater than the measured values. 2.Several basic theories and methods of ereep calculation were analyzed,and some research was done on the methods of creep calculation of prestressed concrete structure,and the calculation function of ere印deformation of currently common used softwares were researched comparatively.There are much difference in the calculation of creep and the processing of prestress among different softwares. 3. Considering the construction process and the system transformation,the post creep deformation of an(85+1 35+85)m prestressed concrete continuous beam bridge was analyzed according to different codes.The results of Chinese Railway 05 Code are two times greater than those of Chinese Highway 04 Code. 4.Influence factors of post ere印deformation of long span prestressed concrete continuous beam bridge with ballastless track were analyzed,and some methods were proposed to reduce later ere印 deformation.The results showed that ere印and prestress lOSS has more effect th

文档评论(0)

1亿VIP精品文档

相关文档