跨区域电力组网技术在BZ39项目中的应用王万旭封园陈丰波周新刚
跨区域电力组网技术在BZ34-9项目中的应用
王万旭 封园 陈丰波 周新刚 金秋 史玮 马金喜
(中海石油(中国)有限公司天津分公司渤海石油研究院 天津300452)
摘 要 常规海上平台供电模式以孤岛电网为主,随着海上油气田产量规模的扩大,区域联合开发及边际油田开发项目逐渐增多,海上平台用电量逐年增加。由于孤岛电网系统容量小、备用机组多、抗冲击性能差,已不满足海上油气田持续滚动开发要求。针对海上平台电网特点,分析了电力组网条件,以BZ34-9项目为例,采用跨区域电力组网技术,整合了垦利电网和BZ28-3/4电网,通过科学、统一规划,提出了电力组网的基本方案,首次完成了海油系统内部跨区域电力大组网,提高了各平台供电可靠性和稳定性,大大减少了电站平台因电源检修或事故退出运行而产生的供电问题,有效地节省了油气田开发、生产、运营成本,达到了节能减排、降本增效的目的。
关键词 孤岛电网;滚动开发;海上平台;跨区域;电力组网;降本增效
中图分类号:TE54 文献标识码:A
The application of cross-region power grid interlink technology in BZ34-9 project
Wang Wanxu Feng Yuan Chen Fengbo Zhou Xingang Jin Qiu Shi Wei Ma Jinxi
(Bohai Oil Research Institute,Tianjin Branch of CNOOC Ltd.,Tianjin 300452,China)
Abstract: The traditional power supply mode on offshore platform is mainly composed of isolated power grid, with the scale enlargement of offshore oil and gas production, regional joint developments and marginal oilfield developments projects increased year by year, together with the power consumption. Because of the small system capacity, more spare units and poor ability to resist impact, the isolated power system can’t meet the requirements of offshore oil and gas fields continuous rolling development any more. According to the power grid’s characteristics on offshore platform, this paper analysis the factors of power grid interlink, taking BZ34-9 projects as an example, using cross-region power grid interlink technology , that integrated both KL and BZ28-3/4 power grid, through scientific and unified plan, proposing a basic solutions, This is the first time in CNOOC Ltd. which realizes cross-region power grid interlink. It is not only more reliable and stable, but also solves the problem of generator drop out of operation when encountered maintenance or accident, That greatly reduces the cost of oil and gas field development, production and operating, achieving the purpose of energy-saving and emission-reduction ,as well as cost-decreasing and benefit-enhancing.
Keywords: isolated po