基于公众角度的垃圾处理项目风险对策研究-环境工程专业论文.docxVIP

基于公众角度的垃圾处理项目风险对策研究-环境工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
基于公众角度的垃圾处理项目风险对策研究-环境工程专业论文

华中科技大学硕士学位论文 华 中 科 技 大 学 硕 士 学 位 论 文 II II Abstract In our country, construction and management of MSW experienced the crossover from all constructed and managed by government to industrialization and general adoption of the market principle. During this period, series of fund from society taken in, the change of national policy of politics and economics, improper layout and site selection, immature technology, and also lack of experience in operation, all of these factors would make the projects more complex. One important characteristic of refuse disposal projects is for public benefit. All risks ultimately will be assumed by the public. Now people are more and more critical to the life environment quality, the MSW disposal problem receives more and more peoples attention. The public’s support means a lot to a MSW disposal project and will be a ruler of the government’s performance. Therefore, the study of risk analysis on solid waste management project from the public aspect is very important. In this thesis, the risk existed in BOT financing mode in refuse burning power plant construction is the wanted research object. Firstly, it starts by introducing features of BOT mode, combined with particularity of refuse burning project, then classification of project risk based public aspect is carried out, the risk is divided to 6 classes as external environment risk, prophase risk, construction risk, operation risk, handover risk and irresistible risk. Each class of risk is then subdivided; in conclusion, a systemic risk indicator system is set up. Secondly, according to comparing all different kind of risk analysis method, it strikes up a risk assessment model with AHP giving weight based on compared number given by some specialist worked in different occupation, and fuzzy evaluation is used to evaluate single index, then go along to evaluate the whole project. The outcome includes two highest weight are operation risk and prophase risk, construction risk ranked 3. Th

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档