6、建立在计算基础上的斜拉桥索力优化.pdfVIP

6、建立在计算基础上的斜拉桥索力优化.pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
6、建立在计算基础上的斜拉桥索力优化

Computer Based Optimising of the Tensioning of Cable-Stayed Bridges Arne Bruer Heinz Pircher Heinz Bokan Civil Engineer Civil Engineer, Senior Partner Civil Engineer, Partner Teknisk Data AS TDV GesmbH TDV GesmbH Oslo, Norway Graz, Austria Graz, Austria Summary A numerical approach to reduce the calculation effort when attempting to minimise the number of stressing operations during the erection of cable-stayed bridges is shown. The proposed method is illustrated with sample calculations from a small example and from the Uddevalla bridge which is currently under construction. The Problem The solution for the optimum tensioning strategy for long span cable-stayed bridges can be an extremely tedious and time-consuming process for the following reasons: Practical reasons • Tensioning one cable affects the forces in all the other cables • Cables can not, in reality, withstand compressive forces but stressing an adjacent cable may apparently cause this condition. • Stressing of the stay cables is an expensive procedure due to the difficulty in the cable stressing procedure. Analytical reasons • A minimal cable tensioning strategy whilst saving a considerable amount of time and money during the construction phase greatly complicates the analytical phase of the design process. • Definition of the tensioning strategy is interrelated with the chosen erection method and the simulation of the erection procedure using the structural model can be very complicated. • The deck girder and pylon system must behave reasonably during all phases of construction. i.e. the deflections should be neither excessive nor incompatible with type of construction. • Creep and Shrinkage (ap

文档评论(0)

l215322 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档