OWNER CONTRACTOR
项目名称
Document number: XXXXXX-X-XX-XX-XXXX-XXX-X
Revision: 0 Contract: 合同号 Date of issue:日期 Page 1 of 7
QA/QC REQUIREMENTS FOR SUB-CONTRACTOR
For approval
For review
Rev. Date Description Issued by Checked by Approved by
OWNER CONTRACTOR
项目名称
Document number: XXXXXX-X-XX-XX-XXXX-XXX-X
Revision: 0 Contract: 合同号 Date of issue:日期 Page 2 of 7
CONTENT
1.0 GENERAL 3
2.0 RESPONSIBILITIES 4
3.0 SUBCONTRACTOR QUALITY PLAN 4
4.0 DOCUMENT SUBMITTAL 5
5.0 SUBCONTRACTOR’S OBLI GATIONS FOR QUALITY 5
6.0 承包商名称 QA AUDITS / INSPECTIONS 5
7.0 MATERIAL TRACEABILITY 6
8.0 SPECIAL PROCESS CONTROL 6
9.0 CONTROL OF INSPECTION, MEASURING AND TEST EQUIPMENT 6
10.0 REPORTING 7
11.0 PERFORMANCE TESTS AND GUARANTEES 7
OWNER CONTRACTOR
项目名称
Document number: XXXXXX-X-XX-XX-XXXX-XXX-X
Revision: 0 Contract: 合同号 Date of issue:日期 Page 3 of 7
1.0 GENERAL
1.1 Scope
This specification defines 承包商名称 s general requireme