铁路桥梁施工与维护 铁路桥梁施工与维护国际化模块(双语版) 2.桥涵建筑物基本知识-教学幻灯–桥面结构和钢桥–陕西铁路工程职业技术学院 - 副本.pptxVIP

  • 4
  • 0
  • 约8.75千字
  • 约 34页
  • 2020-12-11 发布于北京
  • 举报

铁路桥梁施工与维护 铁路桥梁施工与维护国际化模块(双语版) 2.桥涵建筑物基本知识-教学幻灯–桥面结构和钢桥–陕西铁路工程职业技术学院 - 副本.pptx

Technician Training Session II for Mombasa-Nairobi SGR ProjectCourse:the structure and defects of bridge and culvert.Topic:1.the bridge deck 2.steel bridgeLecturer:Hao FujunInterpreter:Julianne XueEmail: 693342647@Date:2016.10.26Topic 1 the components of bridge deckDo you know any kinds of railway bridge deck?Do You KnowWhich deck is used in the new railway of Kenya?1. Types of bridge deck 1. Types of bridge deckSidewalkFootwayFootwalkSide pavement1. Types of bridge deck——ballasted deck Who can tell us the components of the ballasted deck?railing1. Types of bridge deck——ballasted deck 1. Types of bridge deck——ballasted deck 1. Types of bridge deck——ballasted deck Elastic fastener system( Ⅱ )Size of ballast deck:service bridge1.Width≥3.9m2.Height≥0.02m3.Thickness of bottom ballast:0.25(0.35)~0.45m4.Sleeper type:new type IIIRebuild bridge:1.Distance≥2.2m2.Thickness of bottom ballast:0.35cm,and grade 13.Sleeper type:concrete sleeper or new type III1. Types of bridge deck——Open deck Bridge sleeper of open deck bridge is set on the stingers, and rail is designed to overlay the bridge sleepers, which is usually applied for steel bridge.1. Types of bridge deck——Open deck There is an open deck in our institute,let us go to the site and look at it earnestly. 2. Equipment on Bridge deck——guard railFunction1.the effect of keeping the wheels of rolling stock in alignment in case of derailment. 2.helps to minimize damage to the structure and allow easier post-accident cleanup.2. Equipment on Bridge deck——guard railGuard rail grade1.Open deck: use the same type as the stock rail2.Existing ballasted deck track:Sleeper Ⅲ: one grade below the stock railSleeper Ⅱ: one or two grade below the stock rail3.New built or rebuilt ballasted deck track:Use the same type as the stock rail2. Equipment on Bridge deck——guard railsurface should not be less 25 mm ,not be higher 5 mmconnected by four bolts (two for each side), and the nut shall be mounted on the inner side. In the telescopic ad

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档