盾构下穿地下管线施工安全风险评价.docx

盾构下穿地下管线施工安全风险评价 : Inevitably shield tunnel excavation will disturb the surrounding soil, bringing about soil deformation and displacement. The disturbance will reach ground surface, resulting in ground subsidence. Ground subsidence will then cause the nearby underground pipelines to deform. When the ground subsidence increases to someextent, the safety and function of the pipelines will be questioned. Therefore, more attention should be paid to the safety of the pipelines during tunnel excavation. In consideration of the geology of water-rich sand layer at Nanchang, analysis on the security r