- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Constructing Concrete Forms and Reinforcement.ppt
Constructing Concrete Forms and Reinforcement The National Association of Certified Home Inspectors Definitions of terms associated with form construction: Footer form (footing) - a continuous slab of concrete that provides a solid, level foundation for block and other masonry. Construction joint - place where one pouring of concrete stops and another starts. Also called a ‘cold joint’. Control joint - planned break which permits concrete to expand and contract without cracking. Reinforced concrete - concrete slabs or structures that are strengthened with embedded steel rods or wire mesh. Wale - a heavy plank extending along the sides of wooden concrete forms for reinforcement of the 2 x4 studs.? Selecting materials for concrete forms. Metal forms Synthetic materials Wood (most commonly used). It should be straight, sound lumber, free of knots, decay and other defects. Commonly, forms are steel framed plywood. Well constructed concrete forms should be: Substantial enough to retain their correct shape when filled. Freshly mixed concrete exerts great pressure since concrete weighs from 130 to 150 lbs. per cubic foot. Tight to prevent the escape of the water-cement paste, because the loss of water will change the strength of the remaining mixture. Constructed so they can be easily filled from a truck or wheelbarrow. Easily removed after the concrete has hardened. Construction of forms. Use soft, clean, straight lumber. $ Use spruce 2 x 4 or 2 x 6 for form because it will not warp as bad as yellow pine. $?Use green lumber when possible because it does remove the water from the fresh concrete like kiln dried lumber will. Sharpen stakes evenly so they can be driven in straight. Place stakes about 30 inches apart along the outside of the form for 4 inch thick concrete. Place the stakes close when the concrete is more than 4 inches thick. Use a transit or level to adjust the height of forms
您可能关注的文档
- California State University San Marcos.ppt
- Car Monitoring SystemTeam IPA.ppt
- Cardiovascular Disease in WomenModule IV Diagnosis.ppt
- Care of Patient with GERD & Peptic Ulcer.ppt
- Carrefour.ppt
- Case Study 9Pathogenic Bacteriology2009.ppt
- CDM 2007 Training Session 9 – Summary & Where Next.PPT
- Ch 9 Lecture 2 Isomers of Coordination Compounds.ppt
- Chapt09 目标市场营销战略-第九章 目标市场营销战略.ppt
- Chapter – 9Service Facility Location.ppt
- COUPON FRENZY!.ppt
- Cournot Duopoly.ppt
- Created by Cola Benefits Office.ppt
- CS 161Computer Architecture Chapter 5Lecture 9.ppt
- CS533 Concepts of Operating SystemsClass 9.ppt
- Culture and OrganizationalBehavior.PPT
- Design Realization lecture 9.ppt
- Developmental Psychology.ppt
- Diabetes and Pregnancy.ppt
- Diabetes.ppt
文档评论(0)