- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
管道工程的目标与展看(管道局200906)(国外英文资料)
管道工程的目标与展望(管道局200906)(国外英文资料)
One day is lost, like three autumn. If you play, you will rub. It is a pleasure to learn by learning. The man of fire shoots first, and he takes the first. The spring breeze knows not the bitter, not the willow. In this paper, by hbyangyuehui contribution
Powerpoint documents may be a poor experience at the WAP end. It is recommended that you choose TXT, or download the source file to the native view.
The objectives and prospects of the pipeline project
The objectives and prospects of the pipeline project
China national petroleum and natural gas administration
June 2009, June 2009
, China petroleum and natural gas administration
The objectives and prospects of the pipeline project
1 3
The present situation of oil and gas pipeline construction in China
2
Development goals and prospects of the pipeline project
China national petroleum and natural gas administration
The objectives and prospects of the pipeline project
Our country is the first to use the pipe conveying fluid country in the world, our country is the first country to use pipe conveying fluid, as early as the shu han period (221 263 263 as early as in the shu han era (221-263) has been used to spill the connected brine transportation and natural gas. Oil and gas pipeline industry in China to send connected brine transportation and natural gas. The exhibition has been 50 years of history. The exhibition has been 50 years of history. In half a century of oil and gas pipeline 50 years of history Construction has three main waves. Has three main waves.
China national petroleum and natural gas administration
The objectives and prospects of the pipeline project
The first climax in the 1970 s, the first climax in the 1970 s, when the construction of pipelines is originated from the 70 s a large eastern such as daqing, liaohe, shengli oilfield developme
您可能关注的文档
最近下载
- 园长研修总结(3篇).docx VIP
- 东证期货-商品基本面量化框架系列-二-:黄金择时因子及多周期合成.pdf VIP
- 2024年9月8日贵州省黔西南州州直遴选(事业单位考聘)笔试真题及答案解析.doc VIP
- 安徽省综合评标评审专家入库、续聘考试试题(含答案).docx VIP
- 第2章金属材料组织-4-清华大学-工程材料.ppt VIP
- 第2章金属材料组织-3-清华大学-工程材料.ppt VIP
- 2025政治理论时政热点知识试题库(含+答案).docx VIP
- 2025人民防空防护设备产品选型目录.docx VIP
- 第2章金属材料组织-1-清华大学-工程材料.ppt VIP
- Unit 4 Plants around us课件(63张PPT)三年级上册(2024版).pptx VIP
文档评论(0)