- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
重庆长江大桥施工组织设计(Construction organization design of chongqing changjiang bridge)
重庆长江大桥施工组织设计(Construction organization design of chongqing changjiang bridge)
This article is contributed by atom3848
Doc documents may have a poor browsing experience at the WAP end. It is recommended that you choose TXT, or download the source file to the native view.
Chongqing caiyuanba Yangtze river bridge
Construction organization design/page 1, 14 pages
Steel arch rib installation
无支架缆索吊装施工技术在我公司已应用多年,并在大量的桥梁建设上成功 运用,该技术具有安装精度高,受力明确,便于控制调整,材料设备简单,节省 成本,施工安全快速和可靠性高等一系列优点. 浙江淳安千岛湖南浦大桥主拱肋和上部结构工程采用无支架缆索吊装施工, 缆索吊装系统采用三跨连续体系,设置主塔架两个.起吊方式采用双索道抬吊. 拱肋节段和钢桁架梁节段重量较大,本桥吊装重量以钢桁架梁重量360t进行 控制,设计总吊装能力360t. 重庆菜园坝长江大桥使用无支架缆索吊装施工方法,可以最大程度地减少长 江水对施工的影响,同时上部结构施工时具有快速,高效,安全,经济等优点, 应该说是本桥施工的最优方案. 5.2.9.1拱肋安装的技术工艺设计要点 5.2.9.1 拱肋安装的技术工艺设计要点 (1)拱肋安装前的准备工作 ①检查构件的几何尺寸,焊接质量,表面防腐及预拼装情况,必须达到设计 规定. ②检查按设计或施工方案确定的起吊和扣挂点结构是否满足要求. ③检查主墩台的断面尺寸,预埋件位置及其他质量评定情况,并复测拱座起 拱线处高程,跨距,其允许偏差不得超过有关规定. ④核对安装程序,使安装作业严格按经审核的施工组织设计进行,确保施工 有条不紊,安全稳妥地进行. ⑤清除拱肋表面及管内的杂物,并安装好有关测量和监控标志,仪器. ⑥对安装施工设备系统进行负荷运行试验, 保证整个施工系统顺利安全运转. (2)主拱肋采用无支架缆索吊装,斜拉扣挂悬拼方法施工.结构件型号,数 量等均按有关规定经计算确定,缆索吊机在吊装前必须按规定进行试拉和试吊. 试吊过程必须认真进行施工组织设计,试吊实施过程中,要将各方面的试吊记录 认真,准确填写,以备正式吊装时使用. (3)各扣索位置应与吊挂的拱肋在同一竖直面内,扣塔架上索鞍顶面的高程
Guangxi highway bridge engineering corporation
Chongqing caiyuanba Yangtze river bridge
Construction organization design/page 2 of 14
Should be higher than that of arch rib buckle point elevation, also should carry on the strength and stability calculation. (4) the arch rib joint adopts bolt before welding. (1) paragraphs arch rib by cable suspension when the button is on the tower, you must set up the horizontal horoscope spring wind, its decorate should sign the following provisions: arch rib section cantilever, it would be desirable to set up at each end of the period of the wind cable, symmetry of upstream and downstream of the arch rib by head office two pieces should be set up temporary or permanent transverse connection; The wind cable should be closed in full hole before it can be symmetrical. Reliable protection measures must be t
您可能关注的文档
- 盘算机专业英语教授教养办法切磋(To calculate the professional English teaching method to learn).doc
- 盲文的起源与发展(The origin and development of braille).doc
- 直线平行的特征(The characteristic of a straight line).doc
- 直线的倾斜角和斜率教学设计(The teaching design of straight line inclination and slope).doc
- 直线运动练习题1(So I'm going to do a straight line exercise).doc
- 相似三角形的性质(徐炜蓉)doc(Properties of similar triangles (xu weirong) doc).doc
- 直缝埋弧焊钢管的选用(The selection of straight seam submerged arc welding pipe).doc
- 相由心生、境随心转(The mind is born and the country is free).doc
- 省句中2013届高三化学一轮复习教学案——弱电解质的电离平衡一(A review teaching case of the 2013 high school chemistry review - the electrolytic equilibrium of weak electrolytes).doc
- 省情知识(Open knowledge).doc
- 重装机兵R 攻略(Reinstalled soldier R strategy).doc
- 野外生存求救信号(Survival in the wild).doc
- 金属 防锈 防腐蚀 知识(Anti-corrosion knowledge of metals).doc
- 金属晶体(Metal crystal).doc
- 重邮复试书目(Retest bibliography).doc
- 量变质变规律(Quantitative change rule).doc
- 金属的负价(Negative metal).doc
- 金属材料处理办法(Metal material handling methods).doc
- 金属材料与热处理(Metal materials and heat treatment).doc
- 金山打字通快捷键(Kingsoft type-through shortcut key).doc
文档评论(0)