建筑施工应掌握的基础知识(Basic knowledge of building construction).doc

建筑施工应掌握的基础知识(Basic knowledge of building construction).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑施工应掌握的基础知识(Basic knowledge of building construction)

建筑施工应掌握的基础知识(Basic knowledge of building construction) Basic knowledge of construction, 2011-3-22, 22:35 reading (0) The construction process is as follows: A measurement location - the general layout - precipitation - excavation slope supporting foundation treatment (including pile foundation and natural foundation) - based foundation floor cushion construction and foundation and basement waterproofing - backfill superstructure construction (including formwork, reinforced and concrete engineering) - Roof - Window - wall paint - partition installation - ground cushion - - - - plastering waterproof toilet doors and windows - ground wall paint - ware installation - other equipment installation - household acceptance - acceptance. Two, first dig the foundation and then pile it; Three, according to the pile foundation pile forming method for dry drilling operation method (DIG) pile and mud drilling method (digging hole pile), casing drilling method (DIG) pile, long spiral bored pile, injection pressure grout pile, bored pile, mixing pile with stiffness core (static pressure) and pre drilled and driven pile, driven (static) open open steel pipe pile, prestressed concrete hollow pile and H steel pile, cast-in-place pile, rammed cast-in-situ pile (squeeze), into the closed (static pressure) of precast piles, prestressed concrete hollow pile and closed steel pile etc.. Construction process of brick concrete structure: Positioning line - excavation - cushion cushion cushion template template installation, concrete construction, demolition of brick masonry foundation - beam steel - beam steel bar installation - beam formwork installation - beam concrete construction - beam template removal -- earthwork backfilling Construction process of frame structure: Positioning line - excavation - cushion cushion cushion template template installation, concrete construction demolition -- column foundation steel processing -- column foundation reinforcement installation - column foundatio

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档