- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑施工应掌握的基础知识(Basic knowledge of building construction)
建筑施工应掌握的基础知识(Basic knowledge of building construction)
Basic knowledge of construction, 2011-3-22, 22:35 reading (0)
The construction process is as follows:
A measurement location - the general layout - precipitation - excavation slope supporting foundation treatment (including pile foundation and natural foundation) - based foundation floor cushion construction and foundation and basement waterproofing - backfill superstructure construction (including formwork, reinforced and concrete engineering) - Roof - Window - wall paint - partition installation - ground cushion - - - - plastering waterproof toilet doors and windows - ground wall paint - ware installation - other equipment installation - household acceptance - acceptance.
Two, first dig the foundation and then pile it;
Three, according to the pile foundation pile forming method for dry drilling operation method (DIG) pile and mud drilling method (digging hole pile), casing drilling method (DIG) pile, long spiral bored pile, injection pressure grout pile, bored pile, mixing pile with stiffness core (static pressure) and pre drilled and driven pile, driven (static) open open steel pipe pile, prestressed concrete hollow pile and H steel pile, cast-in-place pile, rammed cast-in-situ pile (squeeze), into the closed (static pressure) of precast piles, prestressed concrete hollow pile and closed steel pile etc.. Construction process of brick concrete structure:
Positioning line - excavation - cushion cushion cushion template template installation, concrete construction, demolition of brick masonry foundation - beam steel - beam steel bar installation - beam formwork installation - beam concrete construction - beam template removal -- earthwork backfilling
Construction process of frame structure:
Positioning line - excavation - cushion cushion cushion template template installation, concrete construction demolition -- column foundation steel processing -- column foundation reinforcement installation - column foundatio
您可能关注的文档
- 学法方案(Learning scheme).doc
- 学校防汛应急预案(School flood prevention emergency plan).doc
- 学会看液晶电视尺寸和分辨率(Learn to watch LCD TV size and resolution).doc
- 学点读心术教你看透人心(Learn some reading and teach you to see through the heart).doc
- 学点Java正则表达式(Learn some Java regular expressions).doc
- 学游戏开发怎样入门,什么样的人最适合游戏开发的学习(Learn game development how to enter, what kind of person is most suitable for the development of game development).doc
- 学生-课程数据库(Student course database).doc
- 学好英语的20条钻石法则(The 20 diamond rules for learning English well).doc
- 学生会活动策划书范文_百度知道(A student event planning book. _ Baidu know).doc
- 学生会主要活动流程介绍(Introduction of main activities of Student Union).doc
文档评论(0)