网站大量收购独家精品文档,联系QQ:2885784924

混凝土工程分项施工组织设计(Design of concrete project sub-item construction organization).doc

混凝土工程分项施工组织设计(Design of concrete project sub-item construction organization).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
混凝土工程分项施工组织设计(Design of concrete project sub-item construction organization) /html/1/ Design of concrete project sub-item construction organization Author: unknown source: online update time: 2007-9-8 11:21:352028 [font: small size] 1. Project overview: Xiamen yuantong center project is located at the intersection of xiamen road and the north road. The three-storey basement structure of the project was completed in April 2000 and has been completed and accepted. In order to adapt to the current market demand, the developer has modified the design of the project on the basis of the original design, and now the market is three floors, all of which are residential. 27 stories on the ground, one of them, as independent shops on the second floor, the height 3.9 meters, three layer for the mall and part of the office space and community center, the height 4.5 meters, four layer to 27 for residence, the height 3.1 meters, the total building height of 88 meters, a total construction area of 52632.06 m2, construction area of 42134.2 m2, including the ground set a layer of floor elevation of + / - 0.000, is equal to the absolute elevation 4.5 meters. Ii. Supply of concrete: The main project concrete adopts the pre-mixed commercial concrete of huaxin concrete engineering development co., LTD. Ready-mixed concrete quality according to national standard GB14902-94 the ready-mixed concrete, mansion (1998) no. 1998 building materials word attachments: xiamen ready-mixed concrete product quality management temporary measures for sex and mansion built (2000) no. 059 of quality control and other relevant provisions, to ensure the quality of the concrete to meet the design requirements and the relevant norms. The concrete casting supply label shall be supplied according to the drawing design label. The amount of concrete C30 for this project is about 3401.8 m3, C35 is about 2529.35 m3, C40 is about 2166.51 m3. 3. Preparation before concrete pouring: 1. In order to speed up the constru

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档