- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
案列精选(Case selection)
31, a 29 storeys of engineering construction projects, the preliminary design has been completed, construction land and financing has been implemented, some 300 people in the construction engineering company, with 150 engineering and technical personnel, 10 national level qualification of the strength of the project manager, as well as the excellent performance in nearly five years, combined with another level of enterprise, through the bidding has achieved the project general contracting tasks, and sign the engineering contract, before start working, contractors construction implementation plan in detail, include:
1. Project overview. Including: site of construction, site of construction and environmental characteristics, construction conditions, characteristics of project management and inventory list of overall requirements and construction projects.
2. Construction deployment. Including: quality, safety and schedule cost objectives of the project; The maximum number of proposed inputs and the average number of people, subcontracting plans, Labour use plans, material supply plans, and mechanical equipment supply plans; Construction procedure; Project management overall arrangement.
3. Organizational structure of construction projects. Includes: organization plan for professional construction tasks (such as how to subcontract, supply of materials and equipment, etc.) and project manager.
4. Construction schedule. Construction progress plan description, construction schedule plan (table), construction schedule management plan.
5. Labour supply plan. Including: management personnel, technical workers, special post personnel, security personnel, etc.
6. Construction preparation work plan. Including: construction preparation work organization and time arrangement, technical preparation and preparation of quality plan, construction site preparation, homework team and management personnel preparation, material preparation, capital preparation.
7. Co
您可能关注的文档
- 混凝土课后答案(Concrete after-school answers).doc
- 混凝土路面施工工艺(Construction technology of concrete pavement).doc
- 混凝土砌块收缩控制(Concrete block shrinkage control).doc
- 混凝土施工方案参考资料(Reference materials for concrete construction projects).doc
- 混凝土施工冷缝的预防及处理(Prevention and treatment of cold joint in concrete construction).doc
- 混凝土说dvdsgs打工撒法国萨达股份(The concrete says that DVDSGS works to saada).doc
- 混凝土有关资料(Concrete information).doc
- 火罐效果辨别和水泡处理(Fire can distinguish and blister treatment).doc
- 火焰之文章(Articles of fire).doc
- 激光加工应用技术基础知识(Basic knowledge of laser processing technology).doc
- 彩钢屋面防水(Colour steel roof waterproof).doc
- 彩虹光印刷知识(Rainbow light printing knowledge).doc
- 彩虹面条(Rainbow noodles).doc
- 成本管理会计(Cost management accounting).doc
- 成本核算(Cost accounting).doc
- 成本会计测验题目(Cost accounting quiz question).doc
- 成本会计名词解释(Cost accounting noun interpretation).doc
- 成本会计试卷(一)(Cost accounting paper (1)).doc
- 成本会计试题a(Cost accounting item a).doc
- 成本管理作业(共三次)(Cost management (three times)).doc
文档评论(0)