- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑工程知识详解10.11.12(Knowledge of construction engineering is detailed in 10.11.12)
Technical requirements for underground waterproofing construction
2 a312042 to understand the construction technical requirements of underground waterproofing engineering
I. general requirements for underground waterproofing works
1. The waterproof level of underground works is divided into four levels.
2. Underground waterproofing works must be carried out by professional waterproof construction teams with corresponding qualifications, and the main construction personnel should hold them
A certificate of practice qualification issued by the administrative department of construction or its designated unit.
2. Self-waterproof concrete structure
1. Waterproof concrete should be used in pre-mixed concrete, and the sand rate should be controlled by 35% ~ 45%.
2. The foundation slab waterproof concrete shall be continuously poured, leaving no construction joints, and the outer shear wall and the bottom of the base shall be set at the lower end
The plate 300mm wall and the bottom slab concrete are cast simultaneously.
3. When the basement structure should be divided into sections for running water construction or after setting up the belt, it will produce vertical concrete construction joints.
The 200mm wide water-stop plate shall be installed with a thickness of 2mm and placed in the construction seam before pouring concrete.
Three, basement coil waterproof
(1) construction of floor waterproof layer
1. The water content of the base is not greater than 9%, the base of the coaming of the bottom plate is more than 600mm, and the two pieces of coil are long
No less than 100mm, the short edge is not less than 150mm, and the upper and lower layers should not be pasted vertically.
2. The coil shall be covered and inspected, and it shall be made of 50mm thick C20 fine stone concrete protection layer on the waterproof rolling material.
The permanent wall of the facade is protected by a cement mortar w
您可能关注的文档
- 现浇混凝土及钢筋混凝土模板工程量(Concrete and reinforced concrete template works).doc
- 献给初学者western blot操作步骤2012版(For beginners western blot operation step 2012).doc
- 献给想买大排量的朋友(To a friend who wants to buy a large displacement).doc
- 湘教版初一地理下册复习提纲(The first geography of the xianghang edition of the book review outline).doc
- 消除汽轮机油系统渗漏油的措施_牛宝新(Measures to eliminate oil leakage in turbine oil system).doc
- 消防安全的基本概念与常识(Basic concepts and common sense of fire safety).doc
- 消防安全手抄报资料(Fire safety hand transcribing information).doc
- 消防安装常见问题(Common problems with fire protection installation).doc
- 消防备案指南(Fire register guide).doc
- 消防符号(Fire signs).doc
- 建筑工程知识详解16.17.18(Knowledge of construction engineering is detailed in 16.17.18).doc
- 建筑构件耐火极限(Building member fire resistance limit).doc
- 建筑工程清包价格(Construction engineering clearance price).doc
- 建筑环境与设备工程专业介绍(Introduction to architectural environment and equipment engineering).doc
- 建筑构造形考作业3(Construction work 3).doc
- 建筑钢筋算量小技巧~(Building rebar calculation technique ~).doc
- 建筑计量计价计算顺序(The order of building metering calculation).doc
- 建筑节能展-发布用参考(Building energy conservation exhibition - release reference).doc
- 建筑经济(Building economy).doc
- 建筑基础知识(Basic building knowledge).doc
最近下载
- 中央空调净化系统标准规范操作规程.doc VIP
- 神志病中西医结合临床诊疗指南-精神分裂症.pdf VIP
- 混凝土重力坝施工课件.pptx VIP
- 辽宁省大连市2025届高三上学期双基测试数学试卷含答案.pdf VIP
- 2025-2026学年赣美版(2024)小学美术三年级上册《创意美术字》教学设计.docx
- 2.2 大气受热过程和大气运动(精品课件)-【居易课堂】2021-2022学年高一地理同步备课优质课件(人教2019必修第一册).pptx VIP
- 杜邦dupont芳纶凯夫拉kevlar应用领域.pdf VIP
- 细胞生物学(第五版)-第8章细胞骨架.ppt VIP
- InCAM Pro基础入门篇(中文).pdf VIP
- 2024届辽宁省大连市高三上学期期末双基测试化学试题及答案.pdf VIP
文档评论(0)