- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工作总结基础设施建设工作总结(Work summary of infrastructure construction work)
education information network
* * year of infrastructure construction work summary
XXXX year is the year that the infrastructure construction and maintenance and renovation project of XXX have been continuously high. Infrastructure engineering staff with strong sense of responsibility and mission to create a world-class university, seize the opportunity to struggle dedication, overcome the heavy task, time is tight, the demand is high, difficult difficult, down-to-earth, hard work to complete the various tasks assigned by the school.
I. investment plan and completion
(I) infrastructure investment plan and completion
X, infrastructure investment plan:
In XXXX, the ministry of education approved the adjustment plan for XXX infrastructure investment, which was RMB 44XX million yuan for the previous year. Among them: the investment plan implemented by the department of infrastructure engineering XXXXX.
X, infrastructure plan completion:
In the year of XXXX, the project implemented by the department of infrastructure construction has completed the construction investment of XXXXX million yuan, among which: (b) completion of the land requisition plan for the state;
(2) XXX plan and completion status
X, XXX plan:
XXX has arranged investment in X4XXX for three years, and the transformation scale of XXXXXXMX, a total of 4X engineering projects (44 projects for renovation projects, 4 new projects);
X, XXX plan completion:
The XXX comprehensive renovation project has been completed and some projects have not been completed and settled.
(3) project settlement audit
A total of XXX items have been completed within the department. (among them, X items of new project and XX items of the renovation project of XX million yuan) have been completed. XX items have been added in the last year, and 4XXXX yuan of investment has been reviewed. The audit of the project settlement in XXXX has increased substantially from the n
您可能关注的文档
- 巴氏奶与普通奶的区别(The difference between buttermilk and regular milk).doc
- 巴勒斯坦旅游旅行攻略(Travel guide to Palestine).doc
- 帮你认字(To help you read).doc
- 巴西ncm 号码(Brazil NCM number).doc
- 帮助我们祛湿的食物(Help us eat clearing damp).doc
- 布法罗旅游指南 (buffalo guide) - 纽约州出境游指南 yododo 游多多(Buffalo guide - New York state travel guide yododo Tours).doc
- 布料机在水泥混凝土路面摊铺施工中的应用_石磊(Application of cloth machine in cement concrete pavement paving construction).doc
- 布料基本知识(Fabric basics).doc
- 布鲁氏菌病防治技术规范(Technical specification for brucellosis).doc
- 布什在林肯号航空母舰上的讲话(Bush's speech on the uss Abraham Lincoln).doc
- 高三生物一轮复习课件第8课时 酶和ATP.pptx
- 高三生物一轮复习课件 细胞中的元素和化合物,细胞中的无机物.pptx
- 2025年中考物理复习答题技巧与模板构建专题04热学必考的三个重点实验(解析版).docx
- 高三生物一轮复习课件:细胞核的结构和功能.pptx
- 高三生物一轮复习课件:光合作用的影响因素及其应用课件.pptx
- 高三生物一轮复习课件:细胞膜与细胞核.pptx
- 高三生物一轮复习课件蛋白质与核酸.pptx
- 高三一轮复习生物:细胞呼吸的原理和应用课件(1).pptx
- 高三生物一轮复习课件第8讲+酶和ATP.pptx
- 2.2基因在染色体上课件高一下学期生物人教版(2019)必修2 (2).pptx
文档评论(0)