隧道施工初期支护技术交底(Technical support of tunnel support at initial stage).docVIP

隧道施工初期支护技术交底(Technical support of tunnel support at initial stage).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
隧道施工初期支护技术交底(Technical support of tunnel support at initial stage) Support in initial stage of tunnel construction Support in initial stage of tunnel construction 1., leading bolt, small pipe should be used with grille steel frame, the length should be 3.0~3.5m, and should be greater than the circulation Ring footage of 2 times. . 2., the leading angle of the bolt should be 10 o~20o, the outer angle of the small pipe should be less than.. 10o. . 3. surface anchor is a kind of surface strengthening stratum, which is suitable for shallow buried section and some bias section. . 4. the periphery grouting of the small pipe is applicable to the surrounding rock within the stability time of less than 12h or even the self stabilization ability. This method Use with the steel frame. . 5. when the stability time of the surrounding rock is between 12~24h, it is necessary to adopt the measures of first advancing support and then excavating With advanced bolt support, if the span of the cavern is larger, it can adopt the support of advance small pipe. . 6. construction parameters of lead bolt and small pipe Surrounding rock grade, bolt diameter, pipe diameter, longitudinal spacing, annular pitch, outer angle (mm) (mm) (m) (CM) anchor small conduits VI, 20~22, 40~50, 3~5, 25~35, 10, o~20o, 5, o~10o V 18~20, 30~40, 2.5~3.5, 40~30 Two 、 wet shotcrete construction 1. construction methods Wet shotcrete is applied to shotcrete, and smooth blasting is done before wet spraying operation. The hole concentration of concrete mixing, The concrete truck is transported to the operation point and is sprayed by a wet jet machine, and a accelerator is added to the nozzle. A, material selection: Cement preferred ordinary portland cement, soft weak rock in the use of early strength cement, water Mud mark no less than 425. The gradation of B, fine aggregate and coarse aggregate accords with the regulation of bolt shotcrete support specification. and Periodically check the moisture content of aggreg

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档