给排水、采暖、自喷消防施工质量通病(Water supply and drainage, heating, fire sprinkler construction quality problems).docVIP

给排水、采暖、自喷消防施工质量通病(Water supply and drainage, heating, fire sprinkler construction quality problems).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
给排水、采暖、自喷消防施工质量通病(Water supply and drainage, heating, fire sprinkler construction quality problems)

给排水、采暖、自喷消防施工质量通病(Water supply and drainage, heating, fire sprinkler construction quality problems) Water supply and drainage, heating, fire sprinkler construction quality problems Abstract: water supply and drainage, heating, fire sprinkler construction quality problems Key words: quality problems 1. Installation and installation of pipe support pier, support and hanger 1. brick pier, no cement mortar masonry, dry brick foundation. 2. brick piers are built with hollow bricks 3. the supporting pipe of the bent pipe at the bottom bend of the drain pipe is not close. 4. gas welding cut bracket, cutting holes. 5. before the construction of the scaffold, the construction site is not measured and calculated, not careful and poorly arranged. When the pipe is installed, the clamping ring hole is dislocated and drilled again, and the waste hole appears on the pipe rack. 6. against the wall bracket clamp type U card is planted outside the tube. 7. expansion bolts outside the fixed pipe support on the concrete wall, Ruth is too long. 8., in the installation of the bracket side welding bracket, installation pipe, a dual-use. 9. laying in the trench, ceiling, there is a thermal extension of the heat preservation horizontal pipe, not using sliding support, sliding support. The pipe is fixed directly on the support. 10. the pipe hanger with thermal elongation, the boom is not in the reverse direction of thermal expansion according to the design and the relevant provisions of deviation. 11. the standpipe support of the same room is not installed on the same elevation without the special requirement of elevation or spacing. 12., plastic pipe and composite pipe support, spacing, not according to specifications requirements. Two. Pipe installation: 1. the basement or underground structure has a pipeline through the outer wall. The waterproof sleeve is not made and installed according to the design requirements and standard drawings. The installation height of the waterproof sleeve an

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档