什么是内业(What is inside the industry).docVIP

什么是内业(What is inside the industry).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
什么是内业(What is inside the industry)

什么是内业(What is inside the industry) Main responsibilities In charge of project information, file management, planning, statistic management and internal management. 1. Responsible for project data, drawings and archives collection and management of engineering project in 1. all drawings receiving, inventory, registration, payment, filing and management work in engineering drawings and received after the registration, in accordance with the regulations issued by the relevant units and personnel by the receiving party signature confirmation. Responsible for storing all the drawings for the project, and each project should be kept at least two sets of formal drawings, including at least one set of drawings design drawings dedicated seal unit. The drawings shall be folded in bulk and classified according to the order of the data, including the floor plan, elevation, sectional drawings, architectural details, structural drawings and construction drawings. 2. collect all technical changes, negotiation records and minutes of meeting the construction process and data archiving: responsible for daily management of received documents and technical documents for classification and registration and filing. Registration, controlled, office, reminders, sign, seal, transfer, filing, archiving and destruction of documents for the project. Responsible for all kinds of data accumulation, sorting, processing, storage and archiving of filing work, pay attention to the principle of confidentiality. Send and receive data documents should be timely registration account, depending on the content and nature of documents accurately and timely submit the project manager approval, and promptly sent to the relevant departments to handle. To ensure the integrity of the design changes, negotiations, requires the parties to strictly enforce the receiving procedures, the design received change, negotiation, must be approved by the parties signed and stamped with the official seal. Design changes (in

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档