网站大量收购独家精品文档,联系QQ:2885784924

家庭电路安装(Home circuit installation).doc

家庭电路安装(Home circuit installation).doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
家庭电路安装(Home circuit installation)

家庭电路安装(Home circuit installation) When I departed, Yang; now I think, the snow. The willow branches on the branches are few and far away, where there is no grass. Mountain air good birds also. Please ask the East flowing water, go and who is good or bad. The net of heaven is large and wide, but it lets nothing through。 Circuit installation specification Temporary power supply shall be provided with complete plug at the construction site. Switch. Socket. Leakage protector shall be installed. Temporary power shall be cable. The power line is divided into three colors: FireWire, red, zero blue, ground yellow. All one-way outlets should be left, zero, right, fire, middle or lit, zero connection. The power supply circuit of each room, the kitchen, the bathroom and the power supply circuit of the bathroom shall be independently used. The leakage protector must be connected with other power supply circuits and shall not overlap its other lines with its zero line. Air conditioning and other high-power appliances, must set up dedicated power supply circuit, air conditioning using 4M2 power line, lighting line using 1.5~2.5M2 power line, all power supply circuit should use 2.5M2 power cord. Other power supply loads refer to this standard. All 20 of the wire into the wall adopt PVC smoldering casing buried, and elbow. Straight section. Wiring connection, the bottom of the box using the cup comb tube can not have joints, can not be exposed in the ceiling on the power line or directly into the wall with cement, in order to ensure the power line can pull or replace. Special circumstances, the power line pipe from the ground through, we should pay special attention to the ground must be used to connect the sleeve tight, in the ground is not allowed to connect the source line, access to the ground must be applied elbow. Before the ground is not closed, we must protect the PVC casing, a rupture injury does not allow the floor tiles of PVC casing should be funded completely covered s

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档