大工10秋《测量学》在线作业(Great works, 10 autumn, surveying, online homework).docVIP

大工10秋《测量学》在线作业(Great works, 10 autumn, surveying, online homework).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大工10秋《测量学》在线作业(Great works, 10 autumn, surveying, online homework)

大工10秋《测量学》在线作业(Great works, 10 autumn, surveying, online homework) In the fall of 10 Surveying online homework 1 Total score: 100 test time: - Test Score: 100 RadioButtonList? A multiple-choice question? RadioButtonList, (a total of 15 questions, a total of 75 points.) Score: 75 1. if the maximum distance is not on the map terrain point more than 3cm, for the 1/500 scale topographic map, the corresponding terrain point at a maximum distance of the field should be (). A. 15m B. 20m C. 30m Answer: A score: 5 points score: 5 2. the cross section of the drawing order from drawings () followed by the pile drawing no.. A. left over from top to bottom, from left to right B. top right from top to bottom, from left to right C. the bottom left from top to bottom, from left to right Answer: C score: 5 points score: 5 3. line measurement of the observation sequence is Zhongping (Gao Cheng), reading a turning point read mm, Gao Cheng reading points in the pile to read a cm. A. along the route direction according to the sequence of observation B. first observation points in the pile, the observation of turning point C. the first turning point in the observation of observation height after pile height Answer: C score: 5 points score: 5 4. road midline measurement on paper fixed line, using the thread intersection method in the field of line working procedure (for). A., threading, intersection B. calculation, put, threading C. calculation, intersection, point Answer: A score: 5 points score: 5 Route 5. (route) measurement is the determination of medium height. A. leveling point B. transfer point The C. pile Answer: C score: 5 points score: 5 The 6. route vertical section leveling is divided into () and medium measurement. A. based leveling measurement B. leveling C. height measurement Answer: A score: 5 points score: 5 7. highway mileage line surveying, broken chain refers to (). The actual mileage is more than the original pile No. A. The actual mileage is less than the original p

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档