- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Process Improvement Plan Template - Free Project Management 过程改进计划模板-的项目管理
Process Improvement Plan Template
This Project Process Improvement Plan Template is free for you to copy and use on your project
and within your organization. We hope that you find this template useful and
welcome your comments. Public distribution of this document is only permitted
from the Project Management Docs official website at:
www.ProjectManagementD
Process Improvement Plan
Project Name
Company Name
Street Address
City, State Zip Code
Date
Table of Contents
Introduction 2
Process Boundaries 2
Process Configuration 3
Process Metrics 4
Targets for Improved Performance 5
Introduction
The process improvement plan is a component of the Project Management Plan. The purpose of the process improvement plan is to document how the project team will analyze various processes, determine where improvements can be made, and implement improvement measures. Like a large part of project management methodology, process improvement is an iterative process that is performed throughout the project’s lifetime.
The CAX Cable project was initiated by BTS Tech in order to develop a new coaxial cable product capable of delivering high-definition picture and sound quality for residential use. This project includes the development of the cable product as well as the manufacturing process required to produce the product. The CAX Cable process improvement plan describes how the manufacturing processes will be analyzed in order to continually monitor and improve production efforts. The process improvement plan will be followed iteratively throughout the project’s lifecycle and includes all processes involved with the manufacturing of the CAX Cable.
The process improvement plan lays out the necessary steps to identify, measure, and implement the necessary process improvements for the CAX Cable product.
Process Boundaries
Process boundaries must be identified as part of the process improvement plan. This establishes where each process begins and ends as well as what the proces
您可能关注的文档
- 广西经济十佳县商业银行县域支行的经营发展分析以工行为例.doc
- 科学运动治疗糖尿病.doc
- 经皮内镜下胃造口术与肠内营养的护理.doc
- 给学生一双审美的眼睛在阅读鉴赏中培养学生的审美情趣.doc
- 老年性白内障围手术期患者健康宣教的分析与护理对策.docx
- 老年痴呆病人的护理要点.doc
- 老年高血压病人用药依从性及其影响因素的研究进展.doc
- 社会古筝教学的调查与研究.doc
- 肠镜检查前后的护理体会.doc
- 肺结核咯血病人的身心护理体会.doc
- 中国国家标准 GB 14287.5-2025电气火灾监控系统 第5部分:测量热解粒子式电气火灾监控探测器.pdf
- 《GB/T 42706.4-2025电子元器件 半导体器件长期贮存 第4部分:贮存》.pdf
- GB/T 42706.4-2025电子元器件 半导体器件长期贮存 第4部分:贮存.pdf
- 中国国家标准 GB/T 42706.4-2025电子元器件 半导体器件长期贮存 第4部分:贮存.pdf
- 中国国家标准 GB/T 19436.2-2025机械电气安全 电敏保护设备 第2部分:使用有源光电保护装置(AOPDs)设备的特殊要求.pdf
- 《GB/T 19436.2-2025机械电气安全 电敏保护设备 第2部分:使用有源光电保护装置(AOPDs)设备的特殊要求》.pdf
- 《GB 27898.4-2025固定消防给水设备 第4部分:消防气体顶压给水设备》.pdf
- GB 27898.4-2025固定消防给水设备 第4部分:消防气体顶压给水设备.pdf
- GB/T 31270.1-2025化学农药环境安全评价试验准则 第1部分:土壤代谢试验.pdf
- 中国国家标准 GB/T 31270.1-2025化学农药环境安全评价试验准则 第1部分:土壤代谢试验.pdf
原创力文档


文档评论(0)