网站大量收购独家精品文档,联系QQ:2885784924

ThePhysicsofRadiology-chapter5-2 放射物理 英文版 教学课件.ppt

ThePhysicsofRadiology-chapter5-2 放射物理 英文版 教学课件.ppt

  1. 1、本文档共17页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
ThePhysicsofRadiology-chapter5-2 放射物理 英文版 教学课件

Measurement of Radiation: InstrumentationTechniques Part Two Summary * * BME College Sherman Sheen(辛学刚) The Physics of Radiology Operational amplifiers Example. Suppose the amplifier of Figure has an open loop gain of 105 and an input voltage of 1.0 volts is applied to the circuit. Let R = 1.0 MΩ, and Rf = 10.0 MΩ. Calculate the output voltage and the error voltage. Output voltage Error voltage Practical Devices for Measuring Radiation Position the center of the ion chamber with its buildup cap at the point where one wishes to determine the exposure rate. 2. Set the electrometer to measure current. 3. Ground the sensitive lead of the electrometer with switch S and use the zero adjustment to null the reading. Open S and observe the leakage current, IL. 4. Open S and turn on the unit. A steady current reading should appear on the electrometer. Observe it for a few seconds and record its average value I. If I is large compared with IL the calibration is complete. If it is not, an attempt should be made to reduce the leakage current by carefully cleaning insulation at the end of the cable. 5. The exposure rate is Nx(I-IL). 6. This should now be corrected for temperature and pressure A calibration can equally well be performed using the electrometer as a charge measuring device and the same answer should be obtained. One would proceed as follows: 1. Set the electrometer to measure charge. 2. Ground S and null the device, open S. 3. Turn on the unit for 10 s and measure the charge Q1. 4. Ground the electrometer and readjust the zero, open S. 5. Turn on the Unit for 70 s and measure a charge Q2. 6. The Charge produced in the ion in 1 min is Q2-Q1. 7. Measure the leakage QL in 1 min with the machine off. It should be negligible compared to Q2-Q1. If it is not, clean the insulator. Guarded Construction 1、the central electrode, as before, is imbedded  in a good insulator 2、insulator is cover

您可能关注的文档

文档评论(0)

qiwqpu54 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档