网站大量收购闲置独家精品文档,联系QQ:2885784924

大型铁路客运站咽喉通过能力的研究-交通运输工程专业论文.docx

大型铁路客运站咽喉通过能力的研究-交通运输工程专业论文.docx

  1. 1、本文档共71页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大型铁路客运站咽喉通过能力的研究-交通运输工程专业论文

大型铁路客运站咽喉通过能力的研究 大型铁路客运站咽喉通过能力的研究 兰州交通大学工程硕士学位论文 兰州交通大学工程硕士学位论文 万方数据 万方数据 万方数据 万方数据 Abstract Railway station’s carrying capacity has two kinds,the first one is departure line capacity, the other one is throat carrying capacity.Since the complex layout of the stations’ throat,the Railway station’s carrying capacity is affected by its throat carrying capacity a lot.For large-scale railway passenger station which with the more complex layout,its throat area is more complex,so the layout of its throat area impacts the carrying capacity more.Because the large-scale railway passenger station is centralized processing passenger tranportation business,so it has high requirment for the punctuality. The most of existing studies were focus on the calculating method of the throat carrying capacity, there’s a few studies work on the concrete measures of improving the throat carrying capacity. Firstly,in this paper,introduced the main equipment and technological process at large-scale railway passenger station,then analysed the major factors of the throat carrying capacity of arge-scale railway passenger station,and got five major factors at last,include turnout,depature line,shunting operation,vehicle taking and delivery,the kind of operation,which is one important conclusion in this paper. Secondly, through a lot of analysis and studies found that the research of the Railway station’s throat carrying capacity is equal to the research of the route selection and its arrangement. Based on this conclusion, thirdly , this paper establishded the topological structure of railway passenger station’s throat area, and combined five important factors to establish the model of route selecting and arrangement of large-scale railway passenger station throat area. This model includes three constraints and a objective. The three constraints are: every program only arranges one operation route, a device k has to satisfy the safty using interval when it occupied by different operation r

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档