网站大量收购独家精品文档,联系QQ:2885784924

大倾角煤层回采巷道围岩变形特征与支护参数研究-矿业工程专业论文.docx

大倾角煤层回采巷道围岩变形特征与支护参数研究-矿业工程专业论文.docx

  1. 1、本文档共54页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大倾角煤层回采巷道围岩变形特征与支护参数研究-矿业工程专业论文

万方数据 万方数据 Subject :Study on Deformation Characters and Support Parameters of Large Angle seam Roadway Rock around Specialty :Mining Engineering Name :Qi Xiaohu (Signature) Instructor :Suo Yonglu (Signature) ABSTRACT Jiangcang mine is located in the western Qinghai plateau in Southern Qilian Mountains. Taking Jiangcang Coal Mine Mother Willamette for the study, theoretical analysis and computer simulation and other methods, through field investigation and laboratory testing and other engineering means, on the basis of the first Mining Face roadway deformation mechanism analysis and research on proposed site is suitable for engineering geological conditions of large dip angle coal seam extraction roadway control measures and supporting technologies and theoretical research results in the field of engineering practice, and achieved good results. First we measured the roadway surrounding rock mechanics parameters analyzed in deep inclined seam roadway excavation process may stress condition, estimate the possible direction of displacement and destruction in the form of tunnel excavation in which, initially identified roadway rock deformation and failure characteristics, thus proposed with the corresponding support ways. In the process of this calculation, the important consideration seam dip effects on surrounding rock. Secondly, the main choice for the angle roadway rock and mechanical characteristics, sub-regional arrangement anchor, choose between reasonable and anchor bolt row spacing, length and strength, combined with seam inclination, seam stress characteristics and stress the degree of concentration of the bolt arrangement stress analysis, the angle of the arrangement and bolt preload is adjusted to make it more in line with the actual situation of the coal seam, the use of computer numerical analysis method to support program development will be Simulation studies to find out the weak link, combined with theoretical calculations and computer simulations, to

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档