- 1、本文档共69页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
单热源供热系统二级网调峰热源设置优化研究-供热、供燃气、通风及空调工程专业论文
单热源供热系统二级网调峰热源设置优化研究
单热源供热系统二级网调峰热源设置优化研究
AN OPTIMIZE STUDY OF SETTING PEAK-SHAVING PLANTS WITH SECONDARY NETWODK IN
SINGLE HEAT SOURCE SYSTEM
ABSTRACT
Nowadays, the proportion of building heating energy consumption is larger, the investment of heating system infrastructure is increasing, and energy-saving work has been paid more and more attention. In order to save project investment, reduce heating energy consumption, keep heating systems operation safe and stable, This article had exploratory research for optimization and updating of the heating system by setting up peaking boiler with secondary network in single heat source heating system.
Firstly, the study introduces the development of heat supply status in China, heating energy consumption and energy-efficient ways, performs a new type of heating method - heating system with secondary peak-shaving plants, and then establishes the main system parameters.
This paper, combined the diagram of heat load duration, analyzes the economy of heating system with secondary peak-shaving plants, the optimal ratio between the heat load of the first and the total system is determined by the minimum sum cost that energy and non-energy of the heating system within a life-cycle as the objective function, that is the best primary source of heat-capacity coefficient α.. Taking an ideal model of Shijiazhuang for example, the optimal α value is respectively sought by using gas-fired boilers and electric boiler heating system as peak-shaving heat sources in the secondary heat supply network and the economy of the two heating models are compared. By comparison, gas-fired boiler could save more investment costs, yet, the operation of electric boiler is more complex and the running cost is higher for the character of peak and valley and electric load.
Then, the coefficient α is considered in the different heating district and scale of heating supply, what’s more the work analyzes the influence of factor on the coefficient α, such as th
您可能关注的文档
- 单侧开窗风压自然通风特性研究-供热、供燃气、通风及空调工程专业论文.docx
- 单侧椎弓根内固定单枚cage植入与双侧固定治疗腰椎间盘突出症的疗效对比研究-外科学专业论文.docx
- 单侧椎体后凸成形术控制性球囊扩张治疗骨质疏松性椎体骨折-外科学(骨科学)专业论文.docx
- 单侧曲轴连杆液压发动机曲轴及连杆设计优化-机械工程专业论文.docx
- 单侧椎弓根螺钉固定结合Cage椎间融合对融合节段对侧椎间孔的影响-临床医学(外科学)专业论文.docx
- 单侧椎弓根螺钉固定结合Cage植骨融合术对融合节段对侧小关节突的影响-临床医学(外科学)专业论文.docx
- 单侧椎弓根外入路与双侧椎弓根入路PVP治疗胸椎骨质疏松性椎体压缩骨折的临床对比研究-外科学专业论文.docx
- 单侧椎弓根钉内固定治疗极外侧型腰椎间盘突出症-中医骨伤科学专业论文.docx
- 单侧椎弓根钉内固定治疗极外侧型腰椎间盘突出症的临床观察-中医骨伤科学专业论文.docx
- 单侧椎弓根钉螺联合Cage植骨融合治疗腰椎间盘突出症的应用研究-脊柱外科专业论文.docx
文档评论(0)